Minimizing Bottleneck Overload Risk in Online Edge Task Placement under Workload Uncertainty
RBP places tasks in descending order of standard deviation, each on the server with the smallest post-assignment risk ratio, and refines the assignment with relocations and swaps within a finite per-period online budget, and minimize the largest risk ratio, attained at the risk bottleneck.
Lei Wang, W. Seah, Gang Xu et al.
· 0 citations