An RL-Inspired Probabilistic Updating Heuristic for Mode Selection in Modular Construction Scheduling
Multi-mode project scheduling, in which each activity can be executed in one of several alternative modes with distinct duration and resource requirements, represents a challenging combinatorial optimization problem prevalent in modular construction and manufacturing. While metaheuristic algorithms excel at exploring t...