TOWARD EVIDENCE-BASED ADR SELECTION IN CONSTRUCTION: A REVIEW OF PRACTICE GAPS
The selection of Alternative Dispute Resolution (ADR) methods in construction projects is frequently driven by contractual defaults and practitioner experience rather than systematic evaluation of dispute and project characteristics. This study examines the resulting practice gap through a structured literature review...