Aug 2026· Electronics· Vol 15, pp. 3560· 0 citations· 13 references
Abstract
Field voltage testing after the maintenance of large converter transformers requires high-voltage response verification while preserving the restored equipment boundary. However, conventional direct voltage application on the grid side usually requires the disconnection of high-voltage leads and auxiliary devices, which may alter the original electrical boundary and increase field disturbance. To address this issue, this study develops an integrated framework with three core contributions: a minimal-lead-disconnection induced-voltage testing topology, a boundary-specific engineering-equivalent parasitic-capacitance model, and a terminal-referred phasor-based power-supply capacity-calibration method. Under the proposed testing topology, single-phase power-frequency excitation is applied on the valve side, and the induced-voltage response is established at the grid-side bushings while some of the restored auxiliary-equipment connections are retained. Considering the parasitic capacitance introduced by valve towers, tubular busbars, grading fittings, and grid-side auxiliary devices under the minimal-lead-disconnection boundary, an engineering equivalent model for extracting the valve-side stray capacitance is developed based on quasi-static electric field theory, geometric-envelope dimensional reduction, and conformal-mapping-based edge correction. The grid-side equivalent capacitance is further obtained using equipment parameters. On this basis, the induced-voltage distribution under the interconnection of multiple converter transformers is analyzed, and a power-supply capacity-calibration method considering the phasor relationship between inductive excitation current and capacitive current is established. Pre-test calculations yield a valve-side stray capacitance of 0.96 nF and a grid-side equivalent capacitance of 1.27 nF. When the grid-side induced voltage of phase C reaches 9.90 kV, the induced voltages of phases A and B are 4.56 kV and 5.14 kV, respectively, while the apparent power calculated from the field-measured RMS voltage and current is 1.34 kVA. The results verify the effectiveness of the proposed method for low-disturbance field testing and portable test-power-supply configuration.
Wide-bandgap (WBG) inverter drives impose repetitive high-frequency voltage stress, accelerating insulation degradation and increasing the probability of short-circuit faults in cables and machine windings. However, existing online diagnostic approaches face significant deployment barriers due to their sensitivity to e...
Yue Yu, Hu-Jun Peng, S. Steentjes· 2026 International Conferenc...· 0 citations
This study aims to address the temperature-dependent error of the primary voltage divider (PVD) in direct current electronic voltage transformers (DC-EVT). Taking full advantage of the superior properties of optical fiber sensors such as passivity, light weight and excellent insulation, a high-resolution polarizati...
Jun Zhao, Yushi Wu, Yun-Tian Zhang et al.· Sensor Review· 0 citations
To meet the low-voltage, high-current, and long-duration requirements of thermal and dynamic stability tests for UHV disconnectors and earthing switches, this paper proposes a two-stage step-down test system powered by a 330 kV grid. The system employs a 12.5 MVA transformer (330 kV/35 kV) and a 90 MVA short-time-rated...
Zhi-Lin Kang, Yu-Lin Kang, Jian-Zhen An et al.· Journal of Physics, Conferen...· 0 citations
The proliferation of inverter-based resources (IBRs) and energy storage systems in power grids has led to a decline in the short-circuit ratio (SCR) and reduced fault current magnitudes, compromising the reliability of conventional overcurrent relays (OCRs) and creating protection blind zones. To resolve these vulnerab...
Electrolytic capacitors are widely used as DC-link components in power electronic converters such as switched-mode power supplies (SMPSs) and inverters; however, they are also among the most vulnerable components, and their capacitance degradation critically affects overall system lifetime. Condition monitoring is chal...
Reliable operation of medium-voltage distribution networks critically depends on the integrity of cross-linked polyethylene (XLPE) insulated cables. This paper proposes a diagnostic methodology that integrates leakage current (LC) measurement with phase-resolved partial discharge (PRPD) analysis to assess cable insulat...
K. Janprom, Sittadach Morkmechai, Natchanun Prainetr et al.· International Journal of App...· 0 citations