Using real, measured GPU power traces, chunked prefill scheduling is used to show that chunked prefill scheduling, a latency-motivated technique already deployed by default in production LLM serving, is a controllable knob that regulates power ramp rate without touching peak power.
Abstract
Large language model (LLM) inference serving is a fast-growing electricity load whose power dynamics remain uncharacterized from a grid-planning perspective. Using real, measured GPU power traces, we show that chunked prefill scheduling, a latency-motivated technique already deployed by default in production LLM serving, is a controllable knob that regulates power ramp rate without touching peak power. Contrary to the intuitive hypothesis that splitting a long prompt's computation into smaller steps should flatten its power spike, peak power stays relatively the same while mean ramp rate falls substantially. Critically, this ramp-rate benefit is not a fixed property of the policy: it grows monotonically with system saturation, and we confirm this along two independent axes: concurrency (7.0% at light load to 34.6% at heavy load, mean-ramp reduction) and long-prompt ("whale") request load (from statistically flat at low whale incidence to 42.6% at high whale fraction/size). We translate this single-GPU mechanism into an operational grid quantity, regulation-reserve procurement, posed and solved as a chance-constrained problem using a model-free bootstrap directly resampling real measured power traces. At a representative operating point, this translates to an estimated 20.3-22.7% reduction in the fast-ramping reserve capacity a grid operator would need to provision, across reliability levels from 95% to 99.9%. Together, these results give grid operators a no-cost demand-shaping tool available today, whose benefit is largest precisely when data centers run hottest and grid stress is most salient.
PowerSlider does so with a new Flex SLO contract that turns bounded user slack into an optimization constraint, prefill--think--answer disaggregation exposing per-stage frequency and KV control, and a Karush--Kuhn--Tucker (KKT) online solver re-solving within 7.7 ms of every cap change.
Yueying Li, Jia-Yang Chen, Yuan-Fan Chen et al.· 2 citations
This work reconstructs 4,439 hourly power observations from a 185-day trace of 155,410 GPUs and derives a workload-semantic flexibility envelope that can be written into interconnection and demand-response contracts.
PowerZooJax is introduced, a JAX-based benchmark suite for RL in power system operation that provides five constrained Markov decision process tasks spanning generation, transmission, distribution, distributed energy resources, and data center microgrid and shows substantial speedups over CPU-based simulations.
Zhan-Hua Pan, Xiao Liu, Zhi-Long Cao et al.· 0 citations
A phase-decoupled, model-calibrated controller that hypothesizes that the optimal power setting is a property of the deployed (model, quantization, engine, hardware) combination rather than of the GPU class, that each lane warrants its own profile, and that converting SLO headroom into energy safely requires latency-ga...
Jae Gon Kim, Donghoon Yoo, Hanyul Ryu et al.· 0 citations
Decode-Latency Feedback Prefill is introduced, a model-free controller that changes only prefill work that overlaps active decodes that defines the boundary of the contribution and motivates a completion-timed controller for concurrent CPU and on-device inference.