An integrated BIM framework for schedule-aware construction waste management in building renovation projects

Sep 2026 · Engineering Construction and Architectural Management · pp. 1-17 · 0 citations · 26 references

Abstract

Renovation projects generate volatile and activity-dependent construction waste flows, yet current modelling approaches remain predominantly static, relying on material-based coefficients detached from construction sequencing. Although Building Information Modelling (BIM)enhances quantity traceability, most applications fail to capture daily variability, peak formation and renovation-specific mechanisms such as packaging waste and demolition-related volumetric behaviour. This study addresses these limitations by developing an integrated BIM framework that embeds activity-level waste estimation within scheduling logic to support time-dependent operational planning. A schedule-aware BIM framework was developed and operationalised through the Circular Intelligent Waste Engine (CIWE). BIM-derived quantities were mapped to renovation activities, linked to productivity-based sequencing logic and integrated with waste intensities and demolition coefficients. The framework was applied to a multi-residential case study comprising three renovation strategies with increasing intervention depth. Waste performance was analysed at scenario, activity and temporal levels using cumulative, peak and labour-normalised indicators. Results indicate that operational waste burden is governed primarily by schedule compression and activity concurrency rather than renovation depth alone. The baseline scenario generated 50,664 dm3 of waste with a peak intensity of 377.7 dm3/day, whereas the deep renovation scenario reduced cumulative waste to 33,736 dm3 and peak intensity to 136.2 dm3/day. Distributed sequencing reduced daily volatility and stabilised logistics demand despite increased system complexity. Activity-level analysis further showed that envelope works dominate cumulative waste volume, while installation-intensive systems alter waste composition through packaging-driven flows. By embedding construction waste forecasting within production planning logic, the framework enables proactive peak identification, sequencing optimisation and improved logistics coordination, particularly in occupied and spatially constrained renovation projects. Unlike static BIM-based estimation approaches detached from construction sequencing, this study advances construction waste management by embedding waste forecasting within production planning logic. By reframing construction waste in renovation projects as a schedule-dependent management variable, the framework extends existing BIM-based approaches beyond static estimation.

View source

Similar papers

Review Open access Aug 2026

AI and BIM Integration for Enhanced Construction Management Performance: A Systematic Review

The reviewed studies indicate that BIM-AI workflows may improve planning efficiency, estimation accuracy, and resource allocation, but still faces challenges related to software interoperability, data quality, interdisciplinary coordination, and the limited integration of explicit sustainability indicators within optim...

Serena Vitaliano, Stefano Cascone, C. Arcidiacono · 0 citations
Open access Sep 2026

A Practical Integrated Lean-Digital Framework for Progress Monitoring Enhancement in Substructure and Ground Floor Construction

Persistent inefficiencies in construction projects, including delays, coordination errors, material waste, and budget overrun, have affected the majority of small and medium-sized enterprises (SMEs) in the construction industry. This study presents a cohesive Lean-Digital framework that integrates the Last Planner Syst...

Bo-Hua Zhang, P. Chutima · 0 citations
Open access Oct 2026

Operational Decision Support via BIM-Integrated LCA Workflows

The integration of Environmental Product Declarations (EPDs) as structured data within Building Information Modelling (BIM) workflows for Life-Cycle Assessment (LCA) and design and maintenance decision-making remains constrained. Key barriers include data heterogeneity among EPD programme operators and persistent inter...

D. Bassorizzi, S. Maltese, C. Bolognesi et al. · 0 citations
Sep 2026

Total BIM for sustainable renovation: enabling reuse and data-informed climate decision-making

Although building information modeling (BIM) has been widely recognized for its potential to support sustainability, it typically remains secondary to 2D drawings as the legally binding source of project information, limiting its reliability for informed decision-making. This study examines how Total BIM, where BIM...

Oliver Disney, Mikael Johansson, Per Höglin et al. · 0 citations
Sep 2026

Supporting sustainable building development through BIM-enabled life cycle assessment: evidence from Vietnam

This study aims to develop and validate a building information modeling (BIM)-enabled life cycle assessment (LCA) framework for quantifying and reducing the environmental impacts of buildings during the design stage. The research addresses the limited implementation of BIM-integrated sustainability assessment in de...

Son Vu Hong Pham, Khoi Ngoc Quynh Luu, Nguyen Cao Khoi Nguyen · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.