Accelerated Bridge Construction (ABC) projects in the United States (U.S.) have consistently demonstrated the significant advantages of prefabrication over conventional construction methods. Since the early 2010s, the adoption of ABC has expanded steadily, with projects achieving substantial reductions in construction duration while concurrently mitigating traffic disruptions. Screening-level evaluation and decision-making tools for selecting between ABC and conventional construction methods emerged in the U.S. in the mid-2000s. These tools, together with cost-estimation tools developed to support them, have continued to evolve. This paper presents a comprehensive literature review examining the evolution of screening-level evaluation, decision-making, and cost-estimation tools for ABC projects in the U.S. The review indicates that existing qualitative and quantitative evaluation and decision-making approaches remain practically useful for the selection of ABC methods but exhibit limited methodological robustness when applied to support decisions across a broad range of influencing factors. However, hybrid approaches based on the Analytic Hierarchy Process (AHP) represent an important advancement toward more structured Multi-Criteria Decision-Making (MCDM). In particular, AHP hybrid models constitute a significant progression beyond traditional AHP by mitigating several of its inherent limitations. The review also highlights that early cost-estimation approaches incorporated within evaluation and decision-making frameworks primarily focused on short-term construction costs and road user costs associated with the construction phase. However, with sustainability becoming a principal objective of modern infrastructure management, Life-Cycle Cost (LCC) estimation should comprehensively incorporate long-term Maintenance and Rehabilitation (M&R) expenditures throughout the entire service life of bridge infrastructure. Furthermore, the review highlights the need for improved screening-level MCDM tools capable of strengthening the identification and selection of preferred ABC alternatives during the earliest stages of project development while enhancing their long-term sustainability.
-Value engineering offers a structured way to examine whether construction functions can be delivered at a lower cost while maintaining the performance required by clients and users. Its application becomes problematic when the term is used for price reductions or specification changes without checking their consequenc...
Hasan Zoboun· Iconic research and engineer...· 0 citations
This study assesses the strategies for mitigating Critical Risk Factors (CRFs) for successful
delivery and sustainability of Building Construction Projects (BCP) in Lagos State Nigeria.
The study is necessitated by incessant building collapses and other risk vulnerabilities during
the implementation and habitation s...
K. U. Banna· International Journal of Eco...· 0 citations
Building construction sites are dynamic systems in which safety decisions interact with time, cost, productivity, equipment movement, and spatial constraints. This systematic review examines how building-construction-stage safety is represented in optimization-based and optimization-linked decision studies published be...
J. Seo, JinHwan Kim, Gyeonggyu Park et al.· Buildings· 0 citations
Modular construction (MC) involves constructing facilities using prefabricated modules manufactured offsite and assembled onsite. This construction method offers several advantages, including faster completion, enhanced safety, improved quality, and increased sustainability. Current reviews on MC largely emphasize tech...
H. Qureshi, Fahim Ullah, O. Olatunji et al.· Frontiers in Built Environme...· 0 citations
This paper examines the issue of rapid assessment of the effectiveness of ship design projects within a project management system, where decisions regarding the construction of a new vessel or the purchase or leasing of an existing one are made under conditions of uncertainty, limited initial information and significan...
O. Demidiuk, A. Bondar· Development of Management an...· 0 citations
Industrial construction projects involve complex interactions among uncertainty, risk, schedule, and cost, motivating the development of advanced analytical and decision-support methodologies. This study systematically reviews methodological approaches to risk assessment and performance management in industrial constru...
Cemil Turan, Maksat Kalybek, Aigul Zhasmukhambetova et al.· Mathematics· 0 citations