What Is the Return on Investment of Digital Engineering for Complex Systems Development Schedules? Findings From a Mixed‐Methods Case Study on the Post‐Production Design Change Processes of Navy Assets

Aug 2026 · Systems Engineering · 1 citation · 81 references

TL;DR

This research presents the first quantitative evidence of DE's potential ROI, offering practitioners and policy‐makers a basis for DE investment decisions for system lifecycle management and provides evidence‐based guidance on how to align DE transformation efforts with organizational processes and behaviors.

Abstract

Complex engineered systems routinely face schedule and cost overruns, along with poor post‐deployment performance. Both INCOSE and the U.S. Department of Defense (DoD) have championed Digital Engineering (DE) as a potential remedy, yet most of DE's purported benefits remain anecdotal, and its return on investment (ROI) remains poorly understood. Addressing this gap, this research presents findings from a case study of a Systems Engineering (SE) team conducting the preliminary design process for post‐production design changes to legacy Navy assets. Through a mixed‐methods study, we document why complex system sustainment projects are routinely late, where and to what extent schedule slips arise, and how the DE transformation could improve schedule adherence. This study makes three major contributions. First, it documents four archetypical inefficiency modes driving schedule overruns and explains how these mechanisms unfold in their organizational context. Second, it quantifies the magnitude and deviation of schedule slips. Third, it creates a hypothetical DE‐transformed version of the current process that is aligned with DoD's DE Policy, and compares it against the current state to estimate potential schedule gains. Our findings suggest that DE transformation could reduce the median project duration by 50.1% and the standard deviation by 41.5%, leading to faster and more predictable timelines. However, the observed gains are unevenly distributed across different task categories. To the best of our knowledge, this study presents the first quantitative evidence of DE's potential ROI, offering practitioners and policy‐makers a basis for DE investment decisions for system lifecycle management. Post‐production design change projects in complex engineered systems frequently exceed projected schedules, underscoring the need for new approaches that improve efficiency and traceability across the system lifecycle. To that end, Digital Engineering (DE) presents an opportunity as the SE community continues to shift toward more digital, model‐based practices. Yet, the practical benefits of DE remain insufficiently understood. This study makes three major contributions that address this gap at its core. First, we identify the origins of delays within a Navy SE team conducting preliminary design phases of post‐production design changes. Through a mixed‐methods approach, we characterize four archetypical inefficiency modes causing schedule overruns and explain how they influence the process. Second, we quantify the location and extent of delays, highlighting how significant delays that are typical for complex system sustainment projects could be materializing. Finally, we provide the first quantitative evidence of DE's return on investment for complex system development, addressing a critical gap in the literature where most DE benefits have remained anecdotal. Results suggest a significant reduction in time and variability in the project timeline. However, schedule gains are not uniform across all task categories, with the most important improvements observed in System Level Modeling and Analysis, Information Exchange, and Review Meetings. For practitioners, these findings provide evidence‐based guidance on how to align DE transformation efforts with organizational processes and behaviors. This means identifying the activities where DE offers the greatest leverage in the organizational context and prioritizing transformation efforts accordingly. This insight helps not only instill confidence in the substantial upfront investments required for DE adoption but also build support for the broader cultural and organizational changes necessary to sustain long‐term transformation.

Read PDF

Similar papers

Open access Sep 2026

Supporting Organizational Resilience Under Systemic Disruptions: A Process-Role Model for Technologically Complex Projects

Systemic disruptions in technologically complex projects often spread beyond the function in which they are first detected. This article follows that movement in two contrasting cases: research and development (R&D) of a software-hardware measuring complex and production of optical data-transmission equipment. The stud...

L. Gamidullaeva, T. Tolstykh, M. Morgunova et al. · 0 citations
Review Open access Sep 2026

Parametric Building Information Modelling (BIM) for project delivery optimization in United Kingdom’s retail architecture to enhance user experience

This study poses a simple but powerful question in a world where retail establishments are more than just places to shop; they are settings that influence how people feel, move, and interact: What if design could listen? This dissertation explores how parametric Building Information Modelling (BIM), a rule-based, adapt...

Swati Swati, A. Shibani, Michel Ghostin et al. · 0 citations
Conference Aug 2026

Implementing a Digital Decision Framework to Enhance Project Outcomes in Complex Well Construction: A Case Study on Drilling / Intervention Planning

The oil and gas industry operates under a framework defined by capital intensity, intrinsic unpredictability, and considerable financial consequences for postponed adjustments. Many large projects do not do well, and studies show that about 70% of them don't reach their operational or financial goals. These failures...

E. Okoro, I. Okafor, T. Egbe et al. · 0 citations
Review Aug 2026

Using Lean Principles to Optimize the Delivery Process of Façade Engineering

Question: How can Lean Construction principles, and Value Stream Mapping (VSM) in particular, be applied to visualize and improve the façade engineering delivery process? Purpose: The purpose of this study is to develop and apply current-state and future-state Value Stream Maps to the façade engineering delivery proce...

M. Georges, I. Srour, H. Abou-Ibrahim · 0 citations
Open access Aug 2026

Automation Impact Analysis: A Conceptual Framework for Tracing System-Wide Consequences of Automation in Off-Site Construction

The automation of production activities in off-site manufacturing plants has demonstrated measurable gains in cycle time, labor efficiency, and dimensional precision. Yet despite these well-documented benefits, adoption among manufacturers remains notably low, driven in part by an insufficient understanding of what aut...

Saeid Metvaei, Qian Chen, Zhen Lei · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.