An assessment of risk factors impacting cost variability in Nigerian construction projects

2022 · Construction Business and Project Management Conference · 0 citations · 26 references

Abstract

According to a review of different authors' work, there are numerous risk factors that could impact the final account sums (FAS) of construction projects, causing variations in contract sum (CS). By minimising the variability between the final account sum FAS and CS, a compelling risk study could help resolve this issue. This research is concerned with the variance amidst CS and FAS while assuming that the observed variance is due to risk. The research adopted a convenience sampling technique, non-probability, purposive and definitive. Data was collected through a questionnaire survey from 43 stakeholders that showed interest from the identified 55 experts in the Nigerian construction sector during a conference organised by the Quantity surveyor's registration board of Nigeria (QSRBN). A quantitative investigation identified the critical risk factors that influence the precision of CS. The findings indicated fifteen significant risk causing variance between FAS and CS (cost variability). These check disparities in construction project planned costs during construction and the observed risk factors considered the concern of project advisors. In addition, the study offers practical solutions that suggest creating an effective mitigation plan for the construction sector by using a framework that supports risk management in project delivery. As a result, five highly significant risk variables in traditionally procured construction projects that initiate variance amidst CS and FAS: Poor programme scheduling, other risks, Availability of design information, Fluctuation and Type of client, which will be considered to develop a construction project risk management framework that will encourage sustainability of the Nigerian construction industry.

Read PDF

Similar papers

Conference Open access 2021

A Systematic Review on Development of a Project Cost Estimation Framework: A Case Study of Nigeria

In Nigeria, there have been insufficient studies in the field of risk-related cost variability. Due to unreliable cost estimation, variations in cost, length, and quality are the direct implications. Cost estimating is difficult, mainly when dealing with uncertainties. The study aims to develop a construction project e...

Babatunde Dosumu, O. Ejohwomu, A. Yunusa-Kaltungo · 2 citations
Review Open access Aug 2026

Assessing Strategies for Mitigating Critical Risk Factors for Successful Delivery of Building Construction Projects

This study assesses the strategies for mitigating Critical Risk Factors (CRFs) for successful delivery and sustainability of Building Construction Projects (BCP) in Lagos State Nigeria. The study is necessitated by incessant building collapses and other risk vulnerabilities during the implementation and habitation s...

K. U. Banna · 0 citations
Review Open access Sep 2026

AN INVESTIGATION INTO ESTIMATING RISK IN CONTRACTORS' TENDER FIGURE

Risk is inherent in all human endeavors, including construction activities, and the risk elements involved are diverse and varied. Construction projects are normally executed under an environment characterized by varying degree of risks and uncertainties, which can result from ‘known’, ‘known-unknown’, and ‘unknown’ co...

Samaila Garba · 0 citations
Conference Open access 2022

Project risk factors leading to construction cost overruns

Most of the construction projects fail to be completed within cost and time. This study aimed to assess the project risk factors that lead to construction cost overruns. The study employed a quantitative research approach. A purposive sampling technique was used to source data from a sample size of 50 respondents. A su...

M. Tshehla · 0 citations
Review Open access Sep 2026

Evaluating Risk Management Practices in the Lagos Ibadan Motorway Reconstruction Project

Large-scale infrastructure projects in developing countries remain highly exposed to uncertainty, and inadequate risk management continues to contribute to delays, cost overruns and quality shortfalls. This study evaluates risk management practices on the Lagos–Ibadan Motorway reconstruction project in Nigeria, focusin...

Abiodun Saheed Olaniyan, Odunayo Rofiyat Olaniyan · 0 citations
Review Open access Sep 2026

Expert assessment of factors influencing claims in construction projects

The objective of this article is to assess the key factors contributing to the emergence of claims in the implementation of construction projects in Poland. The study, which involved the identification and prioritization of the significance of these factors, was conducted using a mixed-method survey addressed to two st...

Agnieszka Leśniak, Monika Górka-Stańczyk, Mirosław Kołodziejczuk · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.