Modern manufacturing enterprises are increasingly transitioning to multi-variety, small-batch production. This shift introduces significant scheduling challenges, particularly due to the job hierarchy constraints inherent in assembling multi-level intermediate parts. Furthermore, non-machining preparation times—such as tool switching, material handling, and equipment standby—significantly impact production efficiency. To address these challenges, this paper investigates the flexible job shop batch scheduling problem by integrating order and operation consolidation under strict job hierarchy constraints. To mathematically formulate the scheduling problem with non-serial operation precedence networks and dynamic batching, we develop a mixed-integer programming model. The primary objective is to simultaneously minimize the maximum completion time (makespan) and total tardiness. To solve this efficiently, an Improved Grey Wolf Optimization (IGWO) algorithm is proposed. The algorithm features a novel two-tier coding scheme tailored for consolidation logic and employs a hybrid population initialization strategy to enhance initial solution quality. Moreover, it improves the standard hunting mechanism, utilizes Variable Neighborhood Search (VNS) for local exploitation, and independently applies a Simulated Annealing (SA) dynamic acceptance mechanism to balance global exploration and local exploitation. Extensive experiments using small-, medium-, and large-scale industrial data from a power station valve manufacturer validate the effectiveness of the proposed model and algorithm in optimizing complex batch scheduling schemes.
In modern manufacturing systems, integrating preventive maintenance into production scheduling is essential to ensure operational efficiency and equipment reliability. This paper addresses the flexible job shop scheduling problem under machine unavailability constraints caused by non‐fixed maintenance tasks. We propo...
Tom Perroux, T. Arbaoui, Leila Merghem Boulahia et al.· International Transactions i...· 0 citations
: The hybrid flow shop scheduling problem (HFSP) is a widely used model for energy-efficient multi-stage manufacturing, yet semiconductor studies rarely combine discrete assembly and packaging, batch burn-in processing and speed-adjustable testing within a single four-stage formulation. Most also treat energy consumpti...
Quanh Thi Hoang Vo, P. Phan, H. T. Nguyễn· Computers, Materials & C...· 0 citations
With the rapid advancement of distributed manufacturing, distributed flexible job shops have become an important production paradigm in high-end equipment manufacturing. However, dynamic job arrivals and preventive maintenance requirements arising from continuous equipment degradation create strong coupling between p...
Xin Yang, Xiao-Ying Yang, Jin-Hao Du et al.· Journal of Computational Des...· 0 citations
Flexible job shop scheduling has been widely investigated in manufacturing systems. However, most existing studies implicitly assume that all required materials are available when operations become ready for processing. In practical production environments, materials are often delivered in dispersed batches, which may...
Zhao-Lin Chen, Xin-Yu Li, Qi-Hao Liu et al.· 2026 IEEE 22nd International...· 0 citations
This work establishes a polynomial equivalence between JSC and a variant of the resource-constrained job shop problem with unit-capacity resources and proposes a genetic algorithm using permutation-with-repetition encoding and active, non-delay, and hybrid schedule evaluation procedures.
Experimental results show that the improved algorithm achieves an optimal Makespan value of 190 in dynamic disturbance scenarios and exhibits strong robustness, providing an efficient and feasible solution for job shop scheduling in complex production environments.
Jianguo Du, Chengkun Li, Zijie Tang· ITM Web of Conferences· 0 citations