We study nonpreemptive scheduling on a single machine with release dates, due dates, positive job weights, and a common processing time. The objective is to minimize total weighted tardiness. Although closely related equal-processing-time problems admit polynomial-time algorithms, the complexity of this problem has remained open in the literature since 2010. We prove that its decision version is strongly NP-complete, even when every job can meet its due date if processed immediately upon release. The reduction is from unweighted MAX-CUT and uses a quadratic number of jobs with polynomially bounded numerical data. Its main ingredient is a constructive normalization theorem that converts every sufficiently inexpensive feasible schedule into a binary choice for each graph vertex; after normalization, total weighted tardiness equals a constant minus a scaled cut value. We also give a deterministic polynomial-time phase-grid assignment algorithm for the shifted objective $\Phi=F+p\sum_jw_j$, where $F$ is total weighted tardiness. The algorithm enumerates at most $N$ release-date residues modulo $p$, solves one minimum-cost assignment problem for each residue, and returns the best phase-grid schedule. It runs in $O(N^5)$ arithmetic operations and achieves the tight ratio $3/2-1/(2N)$ for this algorithm. Because the added term $p\sum_jw_j$ is independent of how the jobs are scheduled, the shifted and original objectives have exactly the same optimal schedules. However, the approximation guarantee applies to the shifted objective; for the original objective, the analysis provides an additive bound. Thus, the paper both resolves the long-standing complexity question and provides a complementary worst-case guarantee for the phase-grid assignment algorithm.
Single-machine asymmetric weighted earliness--tardiness (AWET) scheduling asks how to sequence jobs around a common synchronization date when early and late completion incur unrelated job-dependent penalties. At the boundary nonrestrictive date $d=\sum_jp_j$, a compact V-shaped schedule reduces the continuous-time prob...
Nicholas G. Hall, H. Kellerer, Song Miao· 0 citations
In classical fixed-interval scheduling, each job of a given set must be processed during a prescribed time interval. The goal is to assign each job to exactly one machine such that no two jobs assigned to the same machine overlap in their interiors, and the number of machines used is minimized. Without further constrai...
This work establishes a polynomial equivalence between JSC and a variant of the resource-constrained job shop problem with unit-capacity resources and proposes a genetic algorithm using permutation-with-repetition encoding and active, non-delay, and hybrid schedule evaluation procedures.
We study online scheduling of parallel jobs on $m$ identical processors to minimize maximum flow time. Each arriving job is represented by a directed acyclic graph (DAG) whose vertices are unit-time subjobs and whose edges specify precedence constraints. We consider non-clairvoyant algorithms: the DAG is not known when...
Kunal Agrawal, Owen Druzgal, M. Prabhu et al.· 0 citations
We study makespan minimisation on two identical parallel machines that share a single server for both loading and unloading. Each job must be loaded, processed without interruption on its assigned machine, and unloaded immediately after processing, with a common positive integer duration for all loading and unloading o...
We study the Busy Machine Time with Preemption and Migration and One Resource Requirement problem, motivated by energy minimization in cloud data centers. Given unlimited identical-capacity machines and jobs with release times, deadlines, processing times, and resource requirements, we allow free preemption and migrati...
G. Călinescu, Mozhengfu Liu· 0 citations