Skip to content
Review Open access

Building Information Modeling for Whole-Life-Cycle Bridge Management

Sep 2026 · Academic Journal of Science and Technology · 0 citations · 12 references

Abstract

As bridge construction expands and existing bridges age, fragmented information across design, construction, and operation has become a major obstacle to refined bridge management. BIM provides a shared digital model  for organizing geometry, materials, construction records, inspection information, and maintenance data within one framework. Based on recent research and engineering case studies, this paper reviews the application of BIM in the main stages of bridge projects. In the design stage, BIM is mainly used for parametric modeling, three-dimensional coordination, and conflict checking. In the construction stage, it supports 4D scheduling, visualized technical handover, site coordination, and safety-risk identification. In the operation and maintenance stage, BIM helps connect inspection records, monitoring data, defect descriptions, and maintenance decisions at the component level. The paper also summarizes the practical benefits of BIM in improving information continuity, management efficiency, and decision support. Meanwhile, several challenges remain, including incomplete standards, limited interoperability, model updating, and organizational implementation. Future bridge management is expected to further integrate BIM with digital twins, the Internet of Things, and artificial intelligence.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.