Skip to content
Open access

Short and Long time Impact of SARS-CoV-2 on clinical characters of Graves' Disease Patients: A Retrospective Cohort Study.

Sep 2026 · Endocrine Connections · 0 citations
Medicine

Abstract

Background

To comprehensively evaluate the effects of SARS-CoV-2 infection on treated Graves' disease (GD) patients.

Methods

This single-center retrospective cohort study included 220 patients with GD receiving stable antithyroid drug treatment. Among 179 questionnaire respondents, 107 had confirmed SARS-CoV-2 infection and 72 were uninfected. Paired thyroid-function analyses were performed in 65 infected patients, and long COVID was assessed in 72 participants.

Results

Among the cohort, 107 patients (77.1% female; 69.7% aged <60 years) were infected with SARS-CoV-2. COVID-19 vaccination was less frequent among infected than uninfected participants (70.1% vs 84.7%, P = 0.025). At 12 weeks post-infection, TT3 increased from 1.76 to 1.97 nmol/L (P = 0.032), whereas TSH, FT3, FT4, TT4, and TRAb remained unchanged. Total cholesterol and HDL-C decreased after infection. TT3 changes differed by vaccination status (P for interaction=0.019), although vaccination was not associated with biochemical thyroid-function deterioration (OR 0.88, 95% CI 0.25-3.12). Among 72 participants completing long COVID assessment, 37 (51.4%) met the operational definition; increased hair loss was the most common symptom. Smoking was associated with higher odds of long COVID (OR 5.37, 95% CI 1.05-27.36).

Conclusions

SARS-CoV-2 infection in treated GD patients was associated with modest short-term thyroid and metabolic changes in treated GD patients, while most thyroid indices remained stable. These exploratory findings highlight the need for further prospective studies.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.