An integrated multi-horizon framework for bridge management agencies that eliminates trajectory incoherence entirely, and allocates a per-period budget by maximising discounted, consequence-weighted risk averted, solved as a linear-programming relaxation of a multiple-choice knapsack is proposed.
Abstract
Bridge management agencies must decide not only which structures to treat, but when to treat them over a multi-year programme. Most machine-learning pipelines for bridge condition, however, forecast a single fixed horizon, report only marginal uncertainty, and feed a top-k selection rule that ignores treatment cost and timing. This paper proposes an integrated multi-horizon framework. (i) A horizon-conditioned learner (HCM) is trained on horizon-stacked data with a monotone constraint on the horizon variable, which guarantees coherent deterioration trajectories and, as a by-product, a valid discrete-time hazard and remaining-useful-life estimate. (ii) Predictive uncertainty is certified at the trajectory level by a locally adaptive max-norm conformal band, and calibrated first-passage risks are kept monotone by a coherence-preserving isotonic projection. (iii) A multi-horizon scheduling policy (MHSP) allocates a per-period budget by maximising discounted, consequence-weighted risk averted, solved as a linear-programming relaxation of a multiple-choice knapsack. On a 11,963-bridge NBI-schema longitudinal benchmark with explicit intervention counterfactuals, the HCM eliminates trajectory incoherence entirely (0.0% of bridges, versus 32.2–53.5% for independent per-horizon models and 43.8% for a recursive model) while also being the most accurate learner at every horizon (ROC-AUC 0.952 to 0.903 for h = 2 to 10 years). Per-horizon 90% conformal bands attain only 73.6% joint trajectory coverage; the proposed adaptive max-norm band reaches 89.9% joint coverage while being 9.9% narrower than a Bonferroni band. At a 15% programme budget, MHSP averts 51.9% of consequence-weighted Poor bridge-years, against 33.1% for a single-horizon risk×consequence index, 22.8% for condition-first and 10.6% for age-first triage, reaching 79.9% of a perfect-foresight upper bound. Code and benchmark are fully seeded and reproducible.
Inter-state transmission projects in the United States routinely exceed their approved schedules and budgets, and the point of maximum financial exposure, sanction, when capital is irreversibly committed, is typically reached before the largest sources of delay are quantified. This paper proposes a machine-learning fra...
Lukhanyiso Mpongoshe, C. Adieze· Trends in Renewable Energy· 0 citations
Experimental results based on the C-MAPSS dataset show that this method achieves reasonable performance in common prediction indicators and demonstrates certain advantages over traditional maintenance strategies in the comparison experiments of maintenance decisions.
Si-Jia Yu· SAE technical paper series· 0 citations
The proposed TQRNN30d framework combines a dual-stage quantile regression neural network (QRNN) feature extractor with a multi-stream temporal fusion classifier, which supports held-out-machine performance within the observed homogeneous nine-facility fleet, but does not establish unseen-site, cross-equipment, or cross...
David J. Poland, Daniele Ravì, Na Helian· 0 citations
An integrated framework combining supervised machine learning classification with mathematical optimization to predict equipment failures and minimise maintenance costs under prediction uncertainty is developed, ensuring prediction uncertainty propagates into scheduling decisions and bridging predictive analytics with...
Nooshin Salehabadi, Ming-Yuan Chen· Journal of Quality in Mainte...· 0 citations
Maintenance planning for highway bridges without historical inspection records remains challenging because conventional deterioration models typically require long-term data for calibration. This study proposes an inspection-driven decision-support framework that integrates bridge-specific engineering calibration, Mark...
Uncertainty quantification governs the lead time over which forecast-driven irrigation advice remains trustworthy, and here transparency in the physical layer cost no measurable accuracy.
Andrea Scariolo· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.