Skip to content
Open access

Action-Conditioned Chronos-2 Hybrid for Sample-Efficient MPC Dynamics Modeling: Industrial SO2 Validation

Aug 2026 · Electronics · 1 citation

Abstract

Time-series foundation models are designed to continue observed trajectories, whereas model predictive control (MPC) must compare counterfactual rollouts under candidate future actions. A forecaster whose predictions are invariant to those actions cannot rank controls by predicted plant response, irrespective of forecast error. We formalize this forecasting-to-control gap and convert pretrained Chronos-2 into an action-conditioned dynamics model. Chronos-2 Hybrid combines low-rank target-domain adaptation, separate process-history and future-decision pathways, and gated residual fusion. Removing future-decision conditioning degraded action-response fidelity in all ten Quadrotor seeds. In bidirectional transfer between two 660 MW thermal power units, the unit-balanced area under the sulfur dioxide trajectory root-mean-squared error (RMSE) learning curve was 14.95% lower than that of an input-matched scratch model; at 6 and 24 h of target labels, the RMSEs were 29.0% and 18.5% lower. A separate Benchmark Simulation Model No. 1 study showed the same low-budget pattern under long process memory. Across eight outcome independently matched desulfurization system episodes, the normalized emission–effort performance index was 29.8–69.6% lower during strategy-assisted operation. These results identify the action-conditioned interface required to use a pretrained forecaster in MPC and show why forecast error alone is insufficient to assess control readiness.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.