A Grid-Constrained State-Adaptive Particle Swarm Optimization (GCSA-PSO) strategy that directly searches for implementable pulse sequences in the discrete solution space, thereby improving deployment consistency while reducing the search burden.
Abstract
Harmonic programmed pulse width modulation (HPPWM), offering flexible harmonic regulation, is a promising solution for high-power energy conversion systems. However, most existing methods solve HPPWM in a continuous space while ignoring the finite timer resolution of practical digital controllers. This leads to a potential optimality deviation during deployment. Motivated by this, this paper proposes a Grid-Constrained State-Adaptive Particle Swarm Optimization (GCSA-PSO) strategy. By matching the solution space with practical timer constraints, GCSA-PSO directly searches for implementable pulse sequences in the discrete solution space, thereby improving deployment consistency while reducing the search burden. Moreover, a state-adaptive evaluation strategy is developed to assign different cost evaluations according to particle states, avoiding unnecessary evaluations and improving computational efficiency. Experimental data confirm that, compared with the classical method, the proposed method reduces the computational time while achieving higher control accuracy under practical digital-controller deployment.
The increasing integration of renewable energy sources and advanced communication technologies is transforming conventional power systems into smart grids. However, the stochastic and dynamic nature of energy generation and demand introduces significant challenges in achieving efficient, reliable, and cost-effective en...
Anmol Garg, Akshit Mehtani, Abhishek Kumar et al.· International Conference on...· 0 citations
GMPPT under partial shading conditions (PSC) presents a significant challenge for MPPT techniques, as PSC generates multiple local extrema in the characteristic curves of photovoltaic systems (PVs). Consequently, conventional MPPT solutions are trapped in local extrema, leading to a significant reduction in power gener...
Hien Van Bui, Ha Van Du, P. X. Le et al.· IEEE Access· 0 citations
Economic Load Dispatch (ELD) is essential for efficient power system operation. The
objective is to satisfy demand at minimum cost while meeting op- erational constraints. Valve-
point effects and multiple constraints make the problem nonlinear and nonconvex. These
features limit the performance of conventional optimiz...
Zineb Abdelnoor, R. Benabid, Bendjebbar Mokhtar et al.· ITEGAM- Journal of Engineeri...· 0 citations
Four representative PSO variants are systematically compared on a three-unit ED test system with transmission losses at a load demand of 850 MW, showing that the choice of inertia and acceleration schedules materially affects convergence speed and run-to-run consistency under limited iteration budgets.
Thanh Nguyen Ba· Thu Dau Mot University Journ...· 0 citations
Maximum power point tracking (MPPT) is essential for maximizing photovoltaic (PV) energy conversion under variable irradiance and temperature. Conventional perturb and observe (P&O) and incremental conductance (INC) algorithms are simple to implement but may exhibit slow convergence, steady-state oscillations, and redu...
Y. Poudel, Jeewan Phuyal, Asmita Rijal et al.· Archives of Advanced Enginee...· 0 citations