Skip to content
Open access

Managing Excess Power Generation In A Semi-Isolated Power System Using Electrolysers

Sep 2026 · Works of Georgian Technical University · 0 citations

Abstract

In semi-isolated power systems, in other words, power systems, which have limited and strictly scheduled interconnection capabilities, non-dispatchable energy sources occasionally cause excess generation in the system, in case of which, it is impossible to acquire it sue to either low electricity demand or dispatchable energy sources already operating at minimum load, when they are unable to lower their generation for system balancing. Georgian power system will face a similar challenge in the near future. The power system of Georgia is semi-isolated, has limited generation flexibility and is expected to integrate significant amount of non-dispatchable energy sources (Mostly wind and solar power plants). One innovative and effective way of overcoming above-mentioned challenges is the integration of electrolysers into the transmission network.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.