The results demonstrate that the proposed SAT framework is an effective exact approach for the DFJSP, combining strong solution quality with rigorous optimality certification and offering a complementary exact method for future DFJSP studies and evaluations on additional benchmark instances.
Abstract
The Distributed Flexible Job Shop Scheduling Problem (DFJSP) requires the joint determination of factory assignment, machine selection, and operation sequencing to minimize the makespan. This paper presents an exact SAT-based approach built on an efficient SAT formulation that exploits problem structure through propagation, symmetry breaking, and incremental SAT solving to effectively address these coupled decisions. The proposed method is evaluated on 76 standard benchmark instances from the Fattahi, Brandimarte, and rdata datasets under two- and three-factory configurations. Together with previously established results, the new SAT optimality certificates bring the total number of proven-optimal instances to 72 out of 76, including three newly certified instances; for two of these instances, SAT also improves the previous best-known makespans. Across the benchmark configurations, SAT achieves the best results on four of the five configurations and remains competitive with strong exact approaches such as CP and LBBD1_CPIL, as well as existing metaheuristic methods. These results demonstrate that the proposed SAT framework is an effective exact approach for the DFJSP, combining strong solution quality with rigorous optimality certification and offering a complementary exact method for future DFJSP studies and evaluations on additional benchmark instances.
This paper develops the first exact SAT and constraint programming (CP) formulations for the JSPPR, and provides corrected optimal makespans and a complete set of certified optimal results for the JSPPR benchmark, establishing a reliable reference for future studies.
H. Nguyen, Duc Trung Nguyen, Khanh To Van· 0 citations
This work proposes an exact algorithm for the SSP, namely the Combinatorial Branch-and-Bound (C-B\&B) algorithm, which combines two distinct branch-and-bound algorithms, each introducing novel features compared with the existing literature.
Alberto Locatelli, Jean-François Côté, Leandro C. Coelho· 0 citations
In modern manufacturing systems, integrating preventive maintenance into production scheduling is essential to ensure operational efficiency and equipment reliability. This paper addresses the flexible job shop scheduling problem under machine unavailability constraints caused by non‐fixed maintenance tasks. We propo...
Tom Perroux, T. Arbaoui, Leila Merghem Boulahia et al.· International Transactions i...· 0 citations
These findings demonstrate the effectiveness and adaptability of the proposed framework for energy-aware flexible job shop scheduling and show that the BLDMA framework achieves better non-dominated solution sets on the tested instances.
Jia-Yu Liu, Juin-Han Chen, Hai-Yang Liu et al.· International Journal of Ind...· 0 citations
The hybrid flow shop scheduling problem (HFSP) with unrelated parallel machines (UPMs), sequence-dependent setup times (SDSTs), and inter-stage transportation times has recently emerged as a prominent research topic. To address this scheduling problem with the objective of minimizing the maximum completion time (makesp...