Accelerating Production and Reducing Risk. A Novel CT-Based Workflow in a Sand-Prone Offshore Gas Field
Abstract
An operator in the North Malay Basin manages a network of offshore mature gas assets consisting of a central processing platform and multiple unmanned satellite platforms. Production enhancement relies on selectively perforating additional gas-bearing intervals in existing wells. However, water breakthrough, sand production, and offshore logistical constraints require separate coiled tubing (CT) and electric wireline interventions, extending execution schedules, increasing operational complexity, and delaying production restoration. The conventional intervention workflow begins with CT deployment to remove accumulated sand and restore wellbore access, followed by demobilization before electric wireline acquires pulsed neutron saturation logs to verify gas-water contact and determine candidate intervals for zonal isolation and reperforation. Platform deck limitations prevent simultaneous deployment of CT and wireline equipment, requiring sequential mobilizations and multiple pressure-control rig-ups. Consequently, CT functions primarily as a preparatory operation rather than a production-enabling intervention, extending overall campaign duration by two to three months and delaying production recovery across multiple offshore assets. In 2023, a monocable-enabled real-time coiled tubing (MERCT) system incorporating surface-powered telemetry was introduced to integrate reservoir evaluation and production enhancement capabilities into a single CT deployment. Real-time pulsed neutron saturation logging was performed through CT, enabling immediate reservoir evaluation without requiring a separate wireline intervention. Following formation evaluation, the same CT string completed sand cleanout, zonal isolation using surface-commanded or hydraulic drop-ball activation, perforating, milling, and nitrogen lifting before returning the well to production. The integrated workflow eliminated multiple conveyance changes, separate offshore mobilizations, and repeated pressure-control rig-ups previously required between CT and wireline operations. Overall intervention duration was reduced by approximately 18%, while production restoration was accelerated by nearly one month compared with the conventional workflow. Integrating reservoir evaluation and intervention into a single deployment transformed CT from a preparatory cleanout service into the primary production enhancement platform. In addition, transferring formation evaluation from wireline to CT released wireline resources to support wells that did not require sand cleanout, increasing intervention capacity across the campaign while improving vessel utilization and reducing operational complexity. This work demonstrates an integrated single conveyance methodology that combines reservoir evaluation and production enhancement within a single coiled tubing deployment. The workflow eliminates conventional CT-wireline sequencing, improves intervention resource utilization, reduces offshore logistical complexity and operational risk, and provides a scalable approach for mature, sand-prone offshore gas fields where intervention efficiency is constrained by platform and vessel availability.