Slim Casing Design Applications for Efficient and Cost Effective Field Development in the Middle East
Abstract
The company's Code of Practice mandates a heavy-casing well design for artificial gas lift wells and any oil producer, requiring dual casing barriers across shallow aquifer zones to ensure full compliance with well integrity standards. While technically robust, this design carries a significant cost and schedule penalty, typically increasing well cost by approximately 15% and adding an average of eight days to well construction duration. In the context of increasing well complexity and cost sensitivity, the project objective was to optimize well construction by slimming the well design, while fully preserving the double-barrier philosophy across aquifers and maintaining future re-entry capability. This paper presents a detailed case study from a land field in the UAE, highlighting the challenges encountered, the learning curve developed, and the operational breakthroughs achieved by transitioning from a conventional heavy casing design to a light/slim casing architecture. The study documents how the wells were successfully drilled using the optimized design, without compromising well integrity, safety, or regulatory compliance. The optimization process focused on a comprehensive casing point analysis to evaluate competent formation intervals capable of supporting slimmer casing strings while maintaining mechanical integrity and isolation requirements. Continuous well trajectory optimization was implemented, particularly by increasing inclination through problematic formations while drilling the intermediate section, an approach that had been constrained in previous drilling campaigns in the area due to potential complications and limited risk associated. This strategy enabled improved hole stability and facilitated the extension of casing lengths. A critical component of the study was the assessment of the impact on every hole section since they became significantly longer under the optimized design. To address the associated risks, the recent studies of best drilling practices were analysed and deployed, including enhanced wellbore stability mitigation measures, optimized drilling parameters, and the systematic application of Invisible Lost Time (ILT) methodology to minimize hole exposure time, drilling fluids, cement slurries, well cleaning, well control, and non-productive intervals. The project's primary objective was to improve drilling operations, reduce complexity, well costs, and time, while swapping some of the construction phases to minimize well cost and duration. This shift enabled the development of a structured learning curve centred on continuous improvement of critical operations, including planning, execution, performance monitoring, practice documentation, and lesson sharing. Following the successful execution of the pilot wells, the most significant benefit of the slim casing design has been the ability to drill successful and compliant wells while reducing the cost and time compared to the conventional heavy design. This has proven to be the key driver for cost, rig time, operational time, heavy load handling, rig crew exposure to heavy loads reduction, while also improving on sustainability. Overall, the optimized approach has delivered week folds of duration savings when compared with the traditional best-performing heavy casing well duration time, representing an overall at least 18% reduction in well duration. This also affects the overall cost, reaching at least 16% savings in rig time and materials per well. The comprehensive experience obtained through sequential planning and execution series has enabled sustained performance improvement, supported by the learning curve developed over the pilot wells. This approach directly addresses current industry challenges, where time and cost are vital parameters for economically successful wells targeted to access remote zones from crowded surface locations, since cost control is recently very critical due to the oil and gas industry situation, including the current production rates, global events, and market instability. The project has proven a novel and sustainable technical solution to address the well architecture of some of the wells successfully and with full well integrity compliance, validating alternative design optimization, operational execution, and systematic knowledge sharing from within the region and globally to deliver wells with shorter durations, increased the desired well delivery, production growth, at a lower cost, while prioritizing the HSE performance. The results confirm that alternative thinking and teamwork from assets, operations, well integrity, upstream, and engineering can significantly exceed the productivity and profitability targets without compromising well integrity, safety, or regulatory compliance.