Skip to content
Open access

Integrated HOR RCA Framework Prioritizes Preventive Maintenance for Circular Knitting Machines

Sep 2026 · Indonesian Journal of Innovation Studies · 0 citations

Abstract

General Background: Machine reliability is essential for maintaining continuous production in the textile industry, particularly where repeated equipment failures generate downtime and operational constraints. Specific Background: PT MNJ experiences frequent disruptions in circular knitting operations, while maintenance activities have not been systematically scheduled. Knowledge Gap: Research integrating risk prioritization with root cause investigation and structured mitigation for circular knitting operations remains limited. Aims: This study identifies and addresses major disruption risks through House of Risk (HOR) Phase 1, Root Cause Analysis (RCA), and HOR Phase 2 using interview data, expert questionnaires, and historical machine-failure records. Results: Eighteen risk agents were identified, of which 10 dominant agents accounted for 79.70% of total Aggregate Risk Potential. The absence of a systematic preventive maintenance and cleaning schedule was the dominant factor with an ARP of 1,113. Routine daily-to-monthly maintenance scheduling through a Standard Operating Procedure obtained the highest Effectiveness to Difficulty Ratio of 3,339. Novelty: The study combines HOR and RCA to establish a quantitative, root-cause-oriented risk management approach for textile production equipment. Implications: The integrated procedure provides an operational reference for prioritizing mitigation actions, controlling recurrent equipment failures, reducing downtime, and improving production efficiency. Highlights: Eighteen risk agents were detected, with ten accounting for 79.70% of total risk potential. Lack of systematic servicing and cleaning recorded the highest ARP value of 1,113. Daily-to-monthly scheduling through an SOP achieved the highest ETDk value of 3,339. Keywords: Risk Management, House of Risk, Root Cause Analysis, Circular Knitting, Risk Mitigation

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.