Single-bus planning of rural photovoltaic (PV)–wind–battery microgrids can overstate tail reliability because it omits feeder constraints and may use future stress information unavailable to a causal controller. We develop a progressive framework that compares 13 literature-derived planning families under a common budget using a conditional value-at-risk (CVaR)-based tail-reliability score at the 95% level (TRS95). After a backbone is selected, four modifications are assessed in sequence: capacity reallocation, storage preparation, energy–power co-design, and residual tail protection. The resulting design is then tested through feeder-aware siting, rolling-horizon model predictive control, residual-calibrated reserves, and nonlinear alternating-current (AC) power-flow audits. Three mechanism-faithful baselines, alternative backbones and module orders, a direct joint-search benchmark, and 20-seed paired trials test whether the staged result is an artifact of the screening protocol. Across four independent confirmation banks, the final variant reaches TRS95 values of 59.98%, 63.51%, 49.25%, and 34.56%. These scores exceed those of the frozen backbone by 2.80, 3.39, 1.37, and 0.51 percentage points, respectively. With equal incremental search effort, a progressive warm-start joint-search strategy improves TRS95 by 0.832 percentage points (95% bootstrap confidence interval: 0.711–0.957) across 80 paired cases; when total candidate counts are equal, the progressive warm-start strategy achieves 99.920% of the direct-joint TRS95 while reducing inclusive runtime by 70.4%. Feeder-aware siting recovers 3.50 and 3.32 percentage points in the two most network-sensitive banks. Causal rolling-horizon control remains within 0.386 percentage points of the corresponding oracle schedules. All 70 envelope-ranked operating points are AC feasible on the IEEE 33-bus feeder, whereas only 30% of the transferred cases are initially feasible on the CIGRE low-voltage feeder; closed-loop re-siting and redispatch restore feasibility in the tested set. Budget sweeps expose the TRS95–capital–scenario-LCOE trade-off. The evidence supports a staged, interpretable evaluation protocol, not universal optimizer superiority or site certification.
This article proposes a two-stage risk-averse scheduling model for an industrial-park virtual power plant in which carbon capture and storage (CCS) is coordinated with photovoltaic (PV) generation under restricted tie-line correction capability. Unlike formulations that treat CCS only as an emission-reduction device, t...
Sustainable energy-system planning requires compact scenario sets that retain the renewable variability and operating stresses that determine investment, yet conventional typical-period methods can preserve average trajectories while removing these conditions. This paper develops a decision-faithful multi-temporal scen...
Bing-Jie Li, Xiao-Yan Hu, Jing Shi et al.· Sustainability· 0 citations
Building-integrated photovoltaic (PV) and battery energy storage (BES) systems require coordinated operation under time-varying demand, intermittent generation, battery constraints, and imperfect forecasts. This study proposes a forecast-informed shrinking-tube model predictive control (MPC) framework for PV-battery bu...
Nan-Yan Gai, Cheng Yang, Jian Liu et al.· Applied Sciences· 0 citations
Renewable-rich distribution dispatch must coordinate grid import, storage, curtailment, and controllable demand while accounting for feeder-security risk. This study evaluates a calibrated soft network-security-aware model predictive control (MPC) framework for radial feeders. A branch-flow and voltage proxy is fitted...
Offshore engineering microgrids integrate renewable generation, energy storage, and large marine test loads. Frequent start-stop transients of test loads, strong wind/PV fluctuations, and saline–humid conditions accelerate equipment aging and threaten power quality, while conventional dispatch neglects battery degradat...
Xiang-Yu Gu, Nan Hu, Lei Zhang et al.· Energies· 0 citations
Day-ahead battery arbitrage requires assessing the return and downside risk of complete charge–discharge cycles. We propose Scenario-Conditioned Risk Optimization (SCARO), which corrects supply and demand forecasts and maps jointly resampled whole-day residuals to price paths. An exact planner identifies adverse outcom...