Energy Management and GWO PI Controller Optimsation in a Photovoltaic Plant with a Hybrid Energy Storage
Abstract
This paper discusses the methodology and development of the Energy Management System (EMS) and the control of the power converters and the DC bus of a hybrid energy storage system (HESS) integrated with photovoltaic panels and an electrical load. Moreover, Grey Wolf Optimisation (GWO) is applied to tune the DC-link voltage. Simulation results under intermittent solar radiance and load profiles demonstrate improved DC bus voltage stability and effective protection of the battery bank against high power demand peaks. The supercapacitor supplies transient power demands, while the battery provides energy support progressively, enhancing system robustness and extending battery lifetime. Although storage sizing is based on a specific load profile, the proposed methodology is applicable to a wide range of solar conditions and lithium-ion battery-supercapacitor (SC) configurations.