Joint Planning of Network Infrastructure, Capacitor Placement, and DES Integration for Cost-Efficient Operation Under Variable Load Demands
Abstract
The power loss reduction in distribution networks is commonly achieved through reconfiguration of feeders (RF), placement of capacitors (PC), and allocation of distributed energy sources (ADES). Although these strategies have been widely studied, most existing approaches consider only peak-load conditions, despite the significant influence of load variability on network operation and planning decisions. This article introduces an MILP framework for a coordinated optimization of RF, PC, and ADES that incorporates hourly load profiles together with distributed energy sources investment and operating costs, capacitor installation costs, and switching operation expenses. The model is applied to six benchmark distribution systems and a large-scale 119-bus network to investigate the effects of load variability on optimal network configuration, component placement, and overall system cost. The results show that accounting for hourly load variations can substantially alter the optimal feeder topology, and the locations and sizes of capacitors and distributed energy sources while reducing annual operating costs compared with peak-load-based planning. However, these improvements are achieved at the expense of increased computational effort, particularly for larger networks. The findings highlight the tradeoff between modeling accuracy and computational complexity and provide practical guidance for distribution system planning under realistic loading conditions.