Mould risk evaluation through testing and hygrothermal simulations of façade-integrated split heat pumps
Abstract
To achieve a fully decarbonized building stock in the European Union by 2050, renovation rates must significantly increase. In dense urban areas, multi-family buildings require efficient and cost-effective solutions to improve building envelope performance and replace outdated fossil-fuel boilers used for space heating (SH) and domestic hot water (DHW) with minimal disruption. Heat pumps (HPs) are a promising alternative, but their adoption in renovated multi-family buildings is often limited by restricted access to heat sources, noise, and disruptive installation processes. Façade integration represents a promising solution, enabling prefabrication that reduces costs and construction time while allowing the installation of silent air-source HPs with minimal disturbance to existing apartments. At the University of Innsbruck (UIBK), a silent mini-split air-to-water HP for decentralized DHW preparation was developed and tested. The system includes a façade-integrated outdoor unit with a compact evaporator and four axial fans, while the indoor unit houses the compressor, condenser, expansion valve, and a hot water storage tank. Because façade-integrated HPs interact with the building envelope, thermo-hygrometric analyses are required to prevent low temperatures that could lead to condensation, mould growth, and long-term damage. Simulations in DELPHIN over five years show that sufficient insulation is needed around the outdoor unit to avoid thermal bridges; installing a 5 cm aerogel panel behind the unit prevents condensation.