A high-rate anaerobic/oxic membrane bioreactor for phosphorus removal and carbon capture from municipal wastewater: Operational limits and energy-recovery potential via sidestream anaerobic digestion.
Abstract
Integrating enhanced biological phosphorus removal (EBPR) with high-rate activated sludge treatment is an attractive strategy for achieving simultaneous phosphorus removal and carbon recovery; however, its stability at short sludge retention times (SRT) under low hydraulic retention time (HRT) conditions remains poorly understood. In this study, a continuous anaerobic/oxic membrane bioreactor (A/O-MBR) was operated to treat real municipal wastewater under systematically varied SRT and HRT to determine the lower EBPR operational limits under carbon capture-oriented conditions. The membrane configuration reduced settling-related biomass loss, allowing the evaluation of EBPR performance under controlled sludge-age conditions. Stable EBPR was maintained at or above a practical lower SRT threshold of approximately 2 d, achieving effluent phosphate concentrations <0.5 mg P L-1, even at a total HRT of 2.5 h. Reducing the SRT to <2 d resulted in a marked decline in phosphorus removal. Batch tests revealed suppressed anaerobic phosphate release and aerobic phosphate uptake at SRTs below 2 d, indicating weakened EBPR-related functional activity. Microbial community analysis showed clear shifts in the dominant taxa across operating conditions. At an SRT of 2 d, approximately 66% of the influent chemical oxygen demand (COD) was redirected to the sludge phase while limiting mineralization, thereby preserving methane recovery potential. A preliminary energy balance based on COD partitioning and biochemical methane potential projected that anaerobic digestion of the captured organics could offset a substantial portion of the system's energy demand. These findings clarify the operational limits of short-SRT EBPR and demonstrate its potential for simultaneous carbon-phosphorus resource management.