Abstract
Tunnel excavation in ground comprising a soft upper stratum and a hard lower stratum posed significant challenges, particularly during invert construction using drilling-and-blasting methods, which could disturb the surrounding rock and the installed support system. To address these issues, this study evaluates the feasibility of an alternative support scheme that eliminates the invert by employing expanded arch feet, thereby utilizing the self-bearing capacity of the underlying hard stratum. Both physical model tests and numerical simulations were conducted to compare the structural performance of a conventional lining with an invert against the proposed expanded arch foot lining. Based on the strain measurements and earth pressure cell readings from the physical model tests, together with the internal force and contact pressure results obtained from the numerical simulations, the axial force, bending moment, and contact pressure between the lining and surrounding rock were compared for the two lining schemes. The safety factors were further calculated using the axial force and bending moment at representative sections. The results showed qualitatively consistent trends between the tests and simulations. Compared with the conventional invert lining, the expanded arch foot lining increased the axial force and bending moment at the arch foot and sidewall by 7.95% and 29.60%, respectively, while slightly reducing those at the crown by 4.44% and 3.09%. This indicates that part of the structural demand is transferred from the crown to the arch foot and sidewall, where the enlarged sections provide greater bearing capacity. The contact pressure distributions of the two lining schemes were different. Owing to its closed structural form, the conventional invert lining produced a more favorable contact pressure condition at the sidewall. In contrast, the expanded arch foot lining showed higher safety factors at the arch foot and sidewall, with increases of 89.80% and 36.00% in the model tests and more than 140% in the numerical simulations. Meanwhile, the internal force distributions of the two lining schemes remained generally comparable. These findings indicated that the lining with expanded arch feet provided sufficient structural capacity at critical sections and could serve as a feasible alternative to the conventional lining with an invert, while avoiding the construction-related disadvantages associated with invert excavation.
This paper investigates the mechanical characteristics of a multiple‐layered lining shield tunnel structure utilized in the Water Resources Allocation Project of the Pearl River Delta through theoretical analysis and model testing. The multiple‐layered lining structure consists of an exterior precast reinforced concr...
Ramin Asadi, Shi-Min Wang, Chang Liu et al.· Deep Underground Science And...· 0 citations
Ultra-deep circular shafts are increasingly deployed in congested urban environments, yet their structural performance in highly sensitive soft clay remains susceptible to diaphragm wall panel joints, structural imperfections, and complex interactions with adjacent structures. This study presents a high-fidelity three-...
Yu-Feng Li, Zhong-Hua Xu, Guanbao Ye et al.· Applied Sciences· 0 citations
Basement construction in dense urban areas with soft clay deposits requires excavation support system capable of controlling ground deformation and retaining structure responses during staged excavation. This study evaluates the behavior of a top-down excavation system in Jakarta soft clay using three-dimensional finit...
Rey Mayo Lais, A. J. Susilo· Indonesian Geotechnical Jour...· 0 citations
Surrounding rock deformation and loosening zone thickness are critical parameters for tunnel support design and stability evaluation. This study examined the variable-cross-section Qingshan Tunnel on the Ren-Zun Expressway. Systematic field monitoring measured surrounding rock pressure, displacement, and loosening zone...
Nai-Tao Zheng, You-Yun Li, Zhi-Feng Wang et al.· Frontiers in Earth Science· 0 citations
Tunnel construction in shallow-buried fractured and swelling schistose rock formations is highly prone to large structural deformation issues. Taking the context of a tunnel located on the Xi’an–Ankang high-speed railway as background, thorough investigations were conducted into the arch crown subsidence, horizontal co...
Yi Yang, Qi-Jun Li, Shuai Zheng· Transportation Research Reco...· 0 citations