Integrating Geometallurgical Variables into Mine Planning Using Block Economic Value and Processing Time Constraints: A Case Study of a Copper Deposit
Geometallurgy provides a framework for incorporating the spatial variability of ore processing responses into mine planning, although its practical implementation in operating mines remains limited due to the scarcity of dedicated metallurgical datasets. This study presents a case study using real operational data from...