Integrating Geometallurgical Variables into Mine Planning Using Block Economic Value and Processing Time Constraints: A Case Study of a Copper Deposit

Sep 2026 · Minerals · Vol 16, pp. 969 · 0 citations · 25 references

Abstract

Geometallurgy provides a framework for incorporating the spatial variability of ore processing responses into mine planning, although its practical implementation in operating mines remains limited due to the scarcity of dedicated metallurgical datasets. This study presents a case study using real operational data from the Salobo copper–gold mine and aims to evaluate how geometallurgical variables can be integrated into long-term mine planning using a limited geometallurgical dataset. Predictive models for Cu metallurgical recovery, Cu concentrate grade, and specific energy were developed from drillhole samples originally collected for resource evaluation. These models were incorporated into a Direct Block Scheduling framework through the formulation of block economic values, enabling the representation of processing-related variability within mine planning decisions. Two planning scenarios were evaluated: the Geomet scenario, which incorporates geometallurgical variables into block economic value without explicit operational time restrictions, and the Geomet_Constraints scenario, which additionally includes an explicit annual processing time constraint based on plant capacity. Although the predictive models exhibited low-to-moderate predictive performance (R2 = 0.45–0.60), their predictions were incorporated into the block model to represent the estimated spatial variability of processing responses. The results show that the Geomet_Constraints scenario generates operationally feasible schedules that comply with plant processing capacity and reduce overall material movement and stockpiling. In contrast, the Geomet scenario results in higher material movement and processing requirements exceeding plant capacity. From an economic perspective, the Geomet_Constraints scenario achieves a slightly higher cumulative NPV (approximately +2.8%), although this difference should be interpreted in the context of the predictive performance of the geometallurgical models. Overall, this case study illustrates how geometallurgical information can be incorporated into a long-term mine planning framework using a limited real-world dataset, and that the inclusion of processing time constraints plays a key role in improving the operational feasibility and economic performance of long-term production schedules.

Read PDF

Similar papers

Open access Sep 2026

Capturing the Value of Lithological Domain Uncertainty in Geometallurgical Mine–Plant Planning

Integrated mine–plant optimization should account for multiple geological uncertainties, yet practice typically considers only grade. Lithological domain uncertainty is a distinct source of geometallurgical variability because rock type governs comminution, recovery, cost, and blending. This paper extends a two-stage s...

Bryan Diaz, A. Quelopana, Mohammad Maleki · 0 citations
Conference Oct 2026

Staged Field Development Planning for Enhanced Geothermal Systems Under Thermal and Economic Constraints

A field development framework is crucial to determine the optimal initial well count and subsequent development schedule under thermal and economic constraints for Enhanced Geothermal Systems (EGS). Most existing EGS studies focus on fixed upfront development design and optimization in which the project starts with t...

M. AbdEllatif, Q. Yuan, S. Leggett · 0 citations
Open access Sep 2026

Integrating Multivariate Geostatistical Simulation and Lithology-Based Geometallurgical Parameters for Ultimate Pit Optimization

This study presents an integrated methodology to incorporate geological uncertainty and geometallurgical variability into ultimate pit optimization for an iron ore deposit in the Quadrilátero Ferrífero, Brazil. The proposed framework integrates multivariate geostatistical simulation, lithological grouping, and economic...

Eduardo da Rosa Aquino, V. F. Navarro Torres, Carlos Enrique Arroyo Ortiz et al. · 0 citations
Open access Sep 2026

Simulation of Categorical and Continuous Variables of a South-American Copper Deposit

Abstract Planning a mining operation requires modeling the metal grades contained in the ore of the deposit based on sampling data, which are inevitably limited relative to the volume of the deposit. Unlike estimation, geostatistical simulation allows not only for the construction of a discrete three- dimensional model...

Marco Lombardi, Mohammad Maleki, S. Kasmaeeyazdi et al. · 0 citations
Open access Aug 2026

Parametric flyover optimization framework

Rapid urbanization in Tier-II Indian cities demands systematic approaches to grade separation infrastructure. Conventional iterative design often fails to integrate geometric, economic, geological, and regulatory constraints. This study develops a parametric optimization framework for urban flyover design, demonstr...

J. Ramchandani, Suddhasheel Ghosh · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.