Jul 2026· International Seminar on Intelligent Technology and Its Applications· pp. 738-743· 0 citations· 18 references
Abstract
Single-phase-to-ground faults are the most common disturbances in 70 kV transmission systems and are generally temporary. However, the continued use of Three-Pole Auto-Reclosing (TPAR) causes all phases to be disconnected even when only one phase is affected, which reduces system reliability and continuity of supply. This study evaluates the application of Single-Pole Auto-Reclosing (SPAR) in a 70 kV transmission network employing a High Resistance Grounding (HRG) scheme through comprehensive simulations that consider Critical Clearing Time (CCT), power surge characteristics, and secondary arc behavior under various operating conditions. The results demonstrate that SPAR can improve system recovery and maintain transient stability during temporary faults. Nevertheless, high overvoltage observed in certain transmission lines produces significant generator oscillations, which limits the applicability of SPAR in those sections. The results show that CCT values ranged from 224 ms to more than 5 s depending on fault location, indicating sufficient transient stability margins. Secondary arc currents were observed in the range of 1.2–1.77 A, significantly below the typical extinction threshold of 20 A, suggesting a high probability of successful arc extinction. However, power surge analysis revealed critical limitations leading to significant generator oscillations. As a result, SPAR was found to be feasible for only 1 out of 5 transmission lines, while the remaining lines were restricted due to excessive transient response. In addition, the performance of SPAR is strongly influenced by the successful extinction of secondary arcs and proper coordination of Directional Ground Relay (DGR), where the relay acts as a comparator to distinguish between unbalanced load conditions and actual ground faults. Therefore, the implementation of SPAR in HRG-based 70 kV systems must be carried out selectively by considering system stability, overvoltage limits, and protection coordination to ensure reliable and secure operation.
This article presents an in-depth analysis of the transient process of power transmission line tripping due to 66kV single-phase grounding faults in the power system. Based on the characteristics of neutral-point non-direct grounding methods, it explores the formation mechanisms of fault current and voltage transients,...
Jun-Liang Liu, Yin-Yu Chen, Yan-Song Chen et al.· Journal of Physics, Conferen...· 0 citations
With the expansion of power systems and the integration of renewable energy sources, the probability of single-phase grounding faults in 220 kV high-voltage transmission lines has significantly increased. Accurately calculating fault currents is crucial for relay protection setting, circuit breaker selection, and the s...
Han Xiao, Chao Sun, Xiao-Li Qu et al.· Journal of Physics, Conferen...· 0 citations
To address the failure of traditional protection caused by the high-proportion and multi-point dispersed integration of distributed generation (DG), this paper conducts an adaptability analysis of multi-stage protection in active distribution networks (ADNs) under extreme conditions. Based on the established short-circ...
Rui-Qian Miao, Shu-Xian Fan, Na Wu et al.· 2026 6th International Confe...· 0 citations
With the growth of emerging data centers and electric vehicles, DC power distribution and hybrid microgrids are attracting growing attention. Due to the lack of a natural zero-crossing point in DC current, reliable DC fault protection is critical. This paper introduces a transient-minimized fault protection scheme util...
High- and ultra-high-voltage overhead power lines are critical for
maintaining a reliable electricity supply to industrial consumers and
regional power systems in the Republic of Kazakhstan. The country’s
large geographic extent, coupled with harsh and highly variable climatic
conditions, imposes additional demands...
N. Kydyrov, V. Kaverin, A. Yurchenko· Bulletin of Toraighyrov Univ...· 0 citations
This study presents a short-circuit and protection coordination analysis of a 33 kV/0.4 kV industrial distribution network supplying a phosphate processing plant in Mauritania. Using ETAP software, the system was modeled to evaluate fault behaviors based on IEC 60909 and IEC 60255-151 standards. The study assesses the...
Cheikh Abdel Kader, Bamba El Heiba, Mohamed El Mamy Mohamed Mahmoud et al.· International Journal of Pow...· 0 citations