Optimizing construction risk management through BIM integration and strategic planning

Jul 2026 · Scientific Reports · Vol 16 · 0 citations · 33 references
Medicine

TL;DR

A hybrid MILP-NSGA-II optimization model is employed to reduce the project cost, the time taken to complete, and the total risk to aid decision-making and the results of the experiment show a high level of predictive performance.

Abstract

The construction projects are characterized by intricate relations of cost, schedule, resources, and structural aspects that frequently give rise to uncertainty and project risk. In order to overcome these difficulties, this research suggests a Hybrid Construction Intelligence Framework Network (HCIF-Net) of intelligent construction risk management through combining the BIM data with predictive analytics and hybrid optimization methods. Several heterogeneous datasets, such as records of construction project management, project reports, and IFC-based BIM structural data, are incorporated to form a unified dataset of 1300 project instances. SMOTE balancing is used after the preprocessing and feature engineering to deal with class imbalance in risk categories. The HCIF-Net framework integrates TabNet to learn tables, Bayesian Network to model probabilistic risks dependencies, Temporal Attention LSTM to predict sequential progress, and Monte Carlo simulation to analyse uncertainty. A hybrid MILP-NSGA-II optimization model is employed to reduce the project cost, the time taken to complete, and the total risk to aid decision-making. The results of the experiment show a high level of predictive performance with an accuracy of 98.88% and close-to-perfect ROC-AUC metrics, and BIM-based visualization dashboards offer intuitive insights to monitor and manage construction risk efficiently.

Read PDF

Similar papers

Review Open access Aug 2026

AI and BIM Integration for Enhanced Construction Management Performance: A Systematic Review

The reviewed studies indicate that BIM-AI workflows may improve planning efficiency, estimation accuracy, and resource allocation, but still faces challenges related to software interoperability, data quality, interdisciplinary coordination, and the limited integration of explicit sustainability indicators within optim...

Serena Vitaliano, Stefano Cascone, C. Arcidiacono · 0 citations
#artificial intelligence Review Open access Sep 2026

Integrated Time–Cost–Risk Management in Industrial Construction: A Systematic Review and Unified Analytical Taxonomy

Industrial construction projects involve complex interactions among uncertainty, risk, schedule, and cost, motivating the development of advanced analytical and decision-support methodologies. This study systematically reviews methodological approaches to risk assessment and performance management in industrial constru...

Cemil Turan, Maksat Kalybek, Aigul Zhasmukhambetova et al. · 0 citations
Review Open access Aug 2026

Revisiting Cost Forecasting Methods in Construction Projects

Accurate cost forecasting is fundamental to construction project management, yet the basis for selecting appropriate forecasting methods across different project conditions remains insufficiently articulated in the literature. This paper presents a structured conceptual review classifying construction cost forecasting...

A. Muḥammad, Muhammad Tariq, Andrea Eross · 0 citations
Open access 2026

Hybrid Fuzzy-NSGA-II Decision-Support Framework for Multi-Objective Risk Assessment of Construction

Credit risk assessment of construction contractors is a process that predicts the likelihood of project default by analyzing contractors’ past performance. Existing methods are mostly single-objective and often neglect key project dimensions such as time, quality, and cost, limiting their accuracy and effectiveness. Th...

Nazanin Rahmani, M. Golsorkhtabaramiri, A. Sahafi · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.