Skip to content
Review Open access

BIM-Based Automated Means-of-Egress Compliance Checking Using IFC for Socially Sustainable and Resilient Buildings: A Saudi Arabian Case Study

Aug 2026 · Sustainability · Vol 18, pp. 8023 · 0 citations · 16 references

Abstract

Safe means of egress are central to occupant safety, social sustainability, and building resilience, yet evidence on BIM-based code checking in Saudi Arabia remains limited. This study assesses the feasibility of an IFC-based Solibri workflow for means-of-egress provisions of SBC 201-CR-2024 using a three-story Group R-1 hotel. Code clauses were decomposed into computable variables and conditions requiring manual review. The Revit model was exported to IFC, validated for semantic and topological readiness, classified in Solibri, and checked using the code-neutral SOL/179 Escape Route Analysis template. The final archived run contained nine rule instances: eight returned OK, while one produced a moderate-severity flag in a supporting fire-compartment rule rather than an SBC-mapped egress rule. One source-model revision was required before the final run. Results indicate that the occupant-load calculation was fully checkable within the bounded case, whereas required route count, travel distance, route-origin and measurement logic, egress height, exit-passageway width, and clear door width were only partially checkable. Credible execution required consistent classifications, explicit exit designations, complete spatial relationships, and continuous routes. Applicability conditions, sprinkler qualification, capacity requirements, exceptions, and route validity still required professional judgment. The workflow demonstrates bounded feasibility rather than validated detection performance or proof of SBC compliance.

Read PDF

Similar papers

Open access Sep 2026

BIM-Based Automation of Structural Quantity Take-off and Scheduling Using Autodesk Revit for Construction Risk Mitigation

Background: Inaccurate manual quantity take-off from two-dimensional drawings remains a documented driver of cost overruns and rework in Indonesian building projects, yet evidence on the accuracy of native BIM-based quantity extraction for heterogeneous, multi-story residential structures remains limited. Objective: Th...

M. Bustamin, Anindias Goldawan Anugrah, I. Komara · 0 citations
Review Open access Sep 2026

CODE-COMPANION: A Cross-Platform Computational Framework for Real-Time BIM Compliance Checking and Digital Building Permit Workflows

CODE-COMPANION is presented, an AI-assisted computational framework that transforms natural-language regulations into structured, machine-readable rules and evaluates them deterministically within Building Information Modeling (BIM) environments and transforms compliance checking from a post-design verification task in...

Idil Zeynep Tonguc, S. Şener · 0 citations
Conference Open access Aug 2026

A BIM-Integrated Framework for Automated Maintenance Management: A Case Study on Door Asset Scheduling in High-Security Facilities

Building maintenance is essential for sustaining operational efficiency and asset longevity, yet many organizations still rely on manual, fragmented processes. This study presents an integrated methodology that combines Building Information Modelling (BIM) with a custom desktop application to automate maintenance sched...

Ahmed E. Mansour, M. Elbehery, S. A. Ibrahim et al. · 0 citations
Review Open access Aug 2026

A systematic review of BIM-based approaches for fire safety and automated code compliance checking

Fire safety requirements involve complex spatial and semantic conditions that go beyond simple attribute checks. This review consolidates approaches for automated code compliance checking (ACCC) for fire safety, classifies them by applied technologies, methods, complexity levels and data formats, and assesses their...

Sabine Hartmann, Luis Jamora, Hendrik Morgenstern et al. · 0 citations
Open access Aug 2026

Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations

The integration of temporary support systems with permanent structural frameworks remains a complex challenge in high-rise construction, where traditional building information modeling (BIM) workflows often lack the coordination needed to optimize both simultaneously. This study addresses that gap through a federated B...

Mohammadsoroush Tafazzoli, Sahar Falegari, A. A. Shirzadi Javid · 0 citations
Review Open access Aug 2026

VR and BIM Integration Framework for H&S Management During Design Phase

The BIM–VR workflow advances design-phase H&S by enabling immersive hazard review, metadata integration, and collaborative issue resolution, offering a replicable solution aligned with digital construction practices.

Anurag Sanal Kumar Sindhujadevi, A. Suliman, SeyedReza RazaviAlavi · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.