A multi-criteria approach to risk assessment and mitigation in UAE oil and gas construction projects: a hybrid Delphi–Fuzzy AHP framework

Sep 2026 · Frontiers in Built Environment · 0 citations · 90 references

Abstract

Oil and gas construction projects (O&GCPs) are among the most complex and high-stakes endeavors in the world. In the UAE, these projects operate under demanding safety and regulatory environments, yet persistent risk-related disruptions continue to undermine project performance. Existing risk management frameworks rarely integrate prioritization with mitigation strategy evaluation, leaving practitioners without structured guidance under conditions of uncertainty. This study addresses that gap by developing a hybrid Delphi–Fuzzy Analytic Hierarchy Process (FAHP) framework for UAE O&GCPs. A systematic literature review identified 51 candidate risk factors, of which 32 organized across six categories achieved expert consensus through a two-round Delphi process involving ten UAE-based industry professionals. FAHP was subsequently applied to derive priority weights for each risk dimension and associated mitigation strategies. Results reveal a strongly hierarchical risk structure in which health, safety, and workforce wellbeing emerged as the dominant criterion with a weight of 0.502, followed by regulatory and site risks at 0.266, while financial factors ranked lowest. Alignment with Health, Safety, and Environment (HSE) standards emerged as the single most critical mitigation sub-criterion, confirming that safety compliance drives project continuity in this sector. These findings provide practitioners with a prioritized, evidence-based roadmap for allocating resources and designing mitigation strategies in UAE O&G construction.

Read PDF

Similar papers

Open access Aug 2026

Design of a Strategic Decision-Making Framework Based on Multi-Criteria Decision Analysis (MCDA) to Address Geopolitical Risks in Oil and Gas Shipping Operations at PT XYZ

Oil and gas shipping operations are increasingly exposed to geopolitical risks because they depend on strategic maritime chokepoints and operate across jurisdictions affected by conflicts, sanctions, security threats, and regulatory changes. This study aimed to develop a strategic decision-making framework based on Mul...

Ivan Rezka Winata, Suhari Pranyoto, N. Nurdianto · 0 citations
Open access Sep 2026

An integrated fuzzy multi-criteria decision making and mixed-integer linear programming optimization framework for project risk assessment and response strategy selection: A case study of a liquefied petroleum gas pipeline construction project

Effective project risk management helps to reduce negative outcomes, especially in construction projects. Because project risk management involves many different parts, an integrated approach is needed to cover all phases. This study proposes an integrated framework for risk planning, identification, assessment, and re...

Mohammad Senisel Bachari, Asgar Khademvatani, Mahdi Iranfar · 0 citations
Open access Aug 2026

Analysis of Risk Management Maturity and Risk Governance Using AHP: A Case Study at Pt Pertamina Hulu Energi for the 2020–2025 Period

The upstream oil and gas industry faces complex strategic, operational, financial, and governance risks, making mature risk management essential for organizational resilience and decision-making. This study aims to determine the priority weights of Risk Management Maturity (RMM) indicators and Risk Governance aspects a...

R. Prakoso, A. R. Pudyantoro, A. Rozamuri · 0 citations
Open access Aug 2026

Integrated Advanced Risk Prioritization of Major Hazards in Oil and Gas Construction Projects - A Case-Based Study FMEA–AHP and Bow-Tie Analysis

Oil and gas construction projects present a compound risk environment in which conventional construction hazards interact with hydrocarbon-process interfaces, temporary works, lifting, excavation, electrical activities, hot work and simultaneous operations (SIMOPS). This paper develops and demonstrates an integrated ri...

Naresh Kumar and Dr. Neeta Banger · 0 citations
Review Open access Sep 2026

Evaluating the efficacy of risk management practices for generative AI integration in sustainable construction projects: a fuzzy set theory approach

This study assesses the significance of risks associated with integrating Generative Artificial Intelligence (GenAI) into risk management for sustainable construction projects (SCPs). Given the early stage of GenAI adoption in the construction sector, the study adopts an exploratory approach to evaluate how industr...

Mohamed Abdelwahab Hassan Mohamed, M. K. Al-mhdawi · 0 citations
Sep 2026

A multi-dimensional framework for assessing emergency preparedness effectiveness in industrial settings using the Delphi method and fuzzy AHP.

BackgroundIndustrial environments face significant risks due to hazardous materials, machinery, and complex supply chains. Effective emergency preparedness is essential for minimizing human, environmental, and economic impacts during crises.ObjectiveThis study develops a comprehensive tool to assess emergency preparedn...

A. Soltanzadeh, M. Mahdinia, Mohaddeseh Ahmadi et al. · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.