Aug 2026· International Journal of Advanced Research in Science, Communication and Technology· pp. 505· 0 citations· 8 references
Abstract
Oil and gas construction projects present a compound risk environment in which conventional construction hazards interact with hydrocarbon-process interfaces, temporary works, lifting, excavation, electrical activities, hot work and simultaneous operations (SIMOPS). This paper develops and demonstrates an integrated risk-prioritization framework that retains the practicality of a conventional probability–severity risk matrix while adding failure-mode analysis, explicit multi-criteria weighting and barrier-based Bow-Tie analysis. A case-based analytical study was undertaken using hazard and control information contained in supplied Oil and Gas infrastructure Limited HIRA and process-safety documents, together with publicly disclosed company safety information. Twenty major hazard scenarios were structured into a comparative dataset. Traditional risk was calculated as probability multiplied by severity. Failure Mode and Effects Analysis (FMEA) was then applied using severity, occurrence, frequency and detectability, followed by an Analytic Hierarchy Process (AHP) weighting scheme of 0.40, 0.25, 0.20 and 0.15 respectively. The resulting normalized integrated index, termed the Fuzzy/FMEA-AHP-inspired Risk Priority Index (FRPI), was used to rank hazards and guide Bow-Tie barrier selection. The analytical results placed excavation collapse, suspended-load struck-by, SIMOPS/communication failure, work at height/man basket and buried-utility strike among the highest priorities. Illustrative control scenarios reduced the baseline P×S scores by approximately 33–67%, depending on the hazard. The study demonstrates that an integrated approach can discriminate between hazards that receive similar traditional risk scores and can translate risk ranking into auditable preventive and mitigative barriers. The numerical expert-rating dataset is explicitly treated as an analytical demonstration dataset where authenticated field ratings were not present; therefore, the paper does not claim that these illustrative values are measured site observations. The framework is intended for validation through an authenticated project HSE expert panel before operational adoption.
Oil and gas construction projects (O&GCPs) are among the most complex and high-stakes endeavors in the world. In the UAE, these projects operate under demanding safety and regulatory environments, yet persistent risk-related disruptions continue to undermine project performance. Existing risk management frameworks rare...
Raghad Almashhour, Abroon Qazi, M. K. Al-mhdawi· Frontiers in Built Environme...· 0 citations
The boiler area is among the most hazardous workplaces in manufacturing because it simultaneously involves thermal energy, high pressure, and electrical energy. Applications of Fault Tree Analysis (FTA) in the Indonesian occupational safety literature commonly stop at the qualitative level, serving as a cause-mapping t...
M. Ubaidillah, Moh. Jufriyanto, Mega Rahayu H· International Journal of Sci...· 0 citations
The Oil and Gas (O&G) and downstream petrochemical industries handle massive volumes of volatile hydrocarbons under extreme thermodynamic conditions, making them exceptionally vulnerable to catastrophic loss-of-containment events. Historically, safety management strategies have operated in silos: occupational safety do...
Vishnu Singh and Prof. P.S Tathod· International Journal of Adv...· 0 citations
Safety-control conditions in open-pit quarrying are shaped by interactions among mine-system configuration and the linked sequences of drilling, blasting, excavation/loading, and haulage operations. Here, we develop a process-informed comparative decision-support framework for assessing safety-control conditions in con...
X. Bui, Ngoc-Hoan Do, N. Nguyen et al.· Applied Sciences· 0 citations
The relentless expansion of the Chemical Process Industry (CPI) necessitates the implementation of rigorous and comprehensive safety evaluations. This research manuscript presents an extensive Quantitative Risk Assessment (QRA) conducted on a major petrochemical refinery, specifically targeting the hazards associated w...
Devesh Dixit and Dr Neeta Banger· International Journal of Adv...· 0 citations
This study presents a quantitative, stakeholder-based assessment of construction accident risks using Failure Mode and Effects Analysis (FMEA), Risk Priority Number (RPN), risk-rating comparison and t-test significance analysis. Primary survey data were obtained from 1,250 respondents equally distributed among five con...
Sivapiran Natarajan, M. G· International Journal For Mu...· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.