Abstract

Oil and gas construction projects present a compound risk environment in which conventional construction hazards interact with hydrocarbon-process interfaces, temporary works, lifting, excavation, electrical activities, hot work and simultaneous operations (SIMOPS). This paper develops and demonstrates an integrated risk-prioritization framework that retains the practicality of a conventional probability–severity risk matrix while adding failure-mode analysis, explicit multi-criteria weighting and barrier-based Bow-Tie analysis. A case-based analytical study was undertaken using hazard and control information contained in supplied Oil and Gas infrastructure Limited HIRA and process-safety documents, together with publicly disclosed company safety information. Twenty major hazard scenarios were structured into a comparative dataset. Traditional risk was calculated as probability multiplied by severity. Failure Mode and Effects Analysis (FMEA) was then applied using severity, occurrence, frequency and detectability, followed by an Analytic Hierarchy Process (AHP) weighting scheme of 0.40, 0.25, 0.20 and 0.15 respectively. The resulting normalized integrated index, termed the Fuzzy/FMEA-AHP-inspired Risk Priority Index (FRPI), was used to rank hazards and guide Bow-Tie barrier selection. The analytical results placed excavation collapse, suspended-load struck-by, SIMOPS/communication failure, work at height/man basket and buried-utility strike among the highest priorities. Illustrative control scenarios reduced the baseline P×S scores by approximately 33–67%, depending on the hazard. The study demonstrates that an integrated approach can discriminate between hazards that receive similar traditional risk scores and can translate risk ranking into auditable preventive and mitigative barriers. The numerical expert-rating dataset is explicitly treated as an analytical demonstration dataset where authenticated field ratings were not present; therefore, the paper does not claim that these illustrative values are measured site observations. The framework is intended for validation through an authenticated project HSE expert panel before operational adoption.

Read PDF

Similar papers

Review Open access Sep 2026

A multi-criteria approach to risk assessment and mitigation in UAE oil and gas construction projects: a hybrid Delphi–Fuzzy AHP framework

Oil and gas construction projects (O&GCPs) are among the most complex and high-stakes endeavors in the world. In the UAE, these projects operate under demanding safety and regulatory environments, yet persistent risk-related disruptions continue to undermine project performance. Existing risk management frameworks rare...

Raghad Almashhour, Abroon Qazi, M. K. Al-mhdawi · 0 citations
Open access Sep 2026

Quantification of Occupational Safety Risk in a Boiler Area through Integration of Quantitative Fault Tree Analysis and HIRADC: A Case Study in the Creamer Industry

The boiler area is among the most hazardous workplaces in manufacturing because it simultaneously involves thermal energy, high pressure, and electrical energy. Applications of Fault Tree Analysis (FTA) in the Indonesian occupational safety literature commonly stop at the qualitative level, serving as a cause-mapping t...

M. Ubaidillah, Moh. Jufriyanto, Mega Rahayu H · 0 citations
Open access Aug 2026

An Integrated EPC-Operational Process Safety Lifecycle Model: Coupling HIRA, FMEA, and Quantitative Risk Assessment for Explosion and Fire Disaster Prevention in Hydrocarbon Facilities

The Oil and Gas (O&G) and downstream petrochemical industries handle massive volumes of volatile hydrocarbons under extreme thermodynamic conditions, making them exceptionally vulnerable to catastrophic loss-of-containment events. Historically, safety management strategies have operated in silos: occupational safety do...

Vishnu Singh and Prof. P.S Tathod · 0 citations
Open access Oct 2026

An AHP-Based Framework for Comparative Assessment of Safety-Control Conditions in Open-Pit Quarries

Safety-control conditions in open-pit quarrying are shaped by interactions among mine-system configuration and the linked sequences of drilling, blasting, excavation/loading, and haulage operations. Here, we develop a process-informed comparative decision-support framework for assessing safety-control conditions in con...

X. Bui, Ngoc-Hoan Do, N. Nguyen et al. · 0 citations
Open access Aug 2026

Quantitative Risk Assessment (QRA) of Major Accident Hazards in a Petrochemical Refinery Using Fault Tree and Consequence Analysis

The relentless expansion of the Chemical Process Industry (CPI) necessitates the implementation of rigorous and comprehensive safety evaluations. This research manuscript presents an extensive Quantitative Risk Assessment (QRA) conducted on a major petrochemical refinery, specifically targeting the hazards associated w...

Devesh Dixit and Dr Neeta Banger · 0 citations
Review Open access Aug 2026

Stakeholder-Based Risk Priority Assessment of Construction Accident Causes: A Comparative FMEA, RPN and t-Test Analysis

This study presents a quantitative, stakeholder-based assessment of construction accident risks using Failure Mode and Effects Analysis (FMEA), Risk Priority Number (RPN), risk-rating comparison and t-test significance analysis. Primary survey data were obtained from 1,250 respondents equally distributed among five con...

Sivapiran Natarajan, M. G · 0 citations