Performance Evaluation of the Overhaul Serious Inspection (SE) Project Outcomes for Steam Power Plant Unit 3 at PT XYZ Using a Mixed Methods Approach Based on RII, RCA, & Comparative Analysis

Sep 2026 · Inkubis Jurnal Ekonomi dan Bisnis · 0 citations · 37 references

Abstract

Background: Power plant overhaul projects play a critical role in maintaining project performance targets (quality, cost, and schedule) and operational reliability indicators, including efficiency, Equivalent Availability Factor (EAF), and Equivalent Forced Outage Rate (EFOR). However, many overhaul projects still experience difficulties in achieving planned targets due to ineffective project management practices. Objective: This study aims to identify the dominant causal factors contributing to the failure of overhaul performance targets and develop managerial improvement strategies. Methods: A mixed-method approach was applied through a questionnaire survey involving 100 respondents (50 owners and 50 contractors), Relative Importance Index (RII) analysis for factor prioritization, tree diagram-based Root Cause Analysis (RCA), comparative analysis of actual project performance data, and Focus Group Discussion (FGD) validation. Results: The Serious Inspection (SI) overhaul project of Steam Power Plant Unit 3 at PT XYZ failed to achieve five of six established performance indicators. The findings revealed that performance failures were caused by systemic interactions among planning, inventory management, resource management, and team execution management. Planning and inventory management were identified as the most dominant factors, resulting in schedule delays, cost overruns, incomplete work before unit return-to-service, and suboptimal operational performance, reflected by an EAF of 88.5% and EFOR of 11.5%. Conclusion: This study recommends risk-based integrated planning, criticality-based inventory optimization, competency improvement, and stronger team coordination to enhance the effectiveness and reliability of future power plant overhaul projects.

Read PDF

Similar papers

Open access Aug 2026

Analysis for Selecting the Operation and Maintenance (O&M) Scheme to Improve Pltmg Performance: A Case Study of PT PLN (Persero)

Gas engine power plants (Pembangkit Listrik Tenaga Mesin Gas / PLTMG) play a critical role in maintaining electricity supply in Indonesia’s small and isolated power systems. However, several units continue to experience low availability and significant operational losses under different operation and maintenance (O&M)...

B. Efendi, Akbar Adhi Utama · 0 citations
Open access Oct 2026

Factors Affecting Project Performance and Project Control Measures for Road Construction Projects at PT. X

The performance of construction projects is a key factor in the success of modern infrastructure development, particularly in achieving cost, quality, and schedule targets. Road improvement projects at PT X face operational challenges, including delays in the delivery of prefabricated materials and extreme weather cond...

Iriene Dewi Kristiani, Michella Beatrix, Mochamad Firmansyah · 0 citations
Open access Sep 2026

An Integrated Multi-Criteria Decision Framework for Reliability Evaluation of Subsea Distribution Units

Subsea Distribution Units (SDUs) are critical components of subsea production control systems, responsible for the distribution of hydraulic power, electrical energy, chemical injection, and communication signals to subsea assets. Failures in SDUs can result in significant production downtime, safety risks, and cost...

Ezebuchi Akandu · 0 citations
Open access Sep 2026

Analysis of Time Overrun and Alternative Solutions using The DMAIC Framework in The 8Th-Floor Electrical Installation Project at Mall X

Time overrun is one of the most critical challenges affecting schedule performance in construction projects. This study aimed to identify the factors contributing to time overruns, evaluate schedule deviations using Earned Value Management (EVM), and propose improvement strategies through the Critical Path Method (CPM)...

Siti Nurul Afina, Syamsir Abduh, Hakimul Batih · 0 citations
Open access Aug 2026

Performance Evaluation of the Supply Chain for Investment-Based Electricity Connection Services using SCOR, IPA, and RCA

This research evaluated the supply chain performance of new electricity connections and capacity upgrades requiring network investment at PLN UP3 Sanggau. The observed problems included project completion delays, application backlogs, deferred connected capacity, and unrealized energy sales. Performance was assessed us...

Aam Amrullah, N. Arvitrida · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.