Skip to content
Open access

Underwater Configuration and Safe Operating Domain of a Deep-Sea Mining Vehicle–Flexible Hose System Considering Structural and Two-Phase Flow Constraints

Sep 2026 · Journal of Marine Science and Engineering · 0 citations · 17 references

Abstract

Flexible hoses connecting seabed mining vehicles to relay stations must remain suspended, limit vehicle loads, satisfy bending constraints, and maintain stable slurry transport. This study combines a lumped mass hose model, time domain vehicle motion analysis, and sequential structural-to-flow coupling with CFD–DEM to determine the safe operating domain of a 220 m single-arch hose. Thirteen buoyancy layouts were screened using seabed clearance, effective tension, curvature, and vehicle loads. Among the tested layouts, a buoyancy section extending from the vehicle end to 0.6L provided the best compromise. During outward travel, turning-induced peaks governed structural safety; after path optimization, the peak longitudinal and lateral hose loads were 17.78 and 22.38 kN, respectively, and the minimum bending radius remained above 2 m. At a reference slurry velocity of 5 m/s and solid volume fraction of 10%, a 40 m vehicle–relay spacing produced strong particle slip and concentration rebound near the lower bend, whereas 197 m promoted particle accumulation and a thicker moving bed. Integrating structural and conveying constraints yielded a recommended horizontal spacing of 80–160 m. Scaled pool tests and a published vertical pipe benchmark supported the numerical approach. The resulting domain provides a practical basis for path boundary design under the assumptions adopted here.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.