Skip to content

FACT: A New Framework for Aging-Aware Circuits Critical Path Prediction With Enhanced Adaptability

Nov 2026 · IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems · Vol 45, pp. 5385-5398 · 0 citations · 30 references

Abstract

With the continuous scaling of integrated circuits (ICs), aging effects pose severe challenges to circuits’ timing analysis. Accurately predicting circuit delays after aging, thereby ensuring circuit reliability throughout its lifecycle, becomes increasingly critical. Identifying the critical path plays a crucial role in this procedure. This article introduces FACT, a framework that integrates a graph neural network (GNN)-based mixture of experts (MoEs) with a masked multimodal attention mechanism to enhance adaptability. FACT dynamically assigns experts based on circuit inputs and leverages masked attention to capture and fuse multiscale information across nodes, improving its generalization to unseen circuits. To the best of our knowledge, this framework is the first to achieve accurate prediction of cell delay while simultaneously predicting the critical path after aging. Experimental results show that FACT performs well in terms of accuracy, efficiency, interpretability, and transferability. The average prediction precision of cell delay reaches 93.25%, along with the average prediction accuracy of the critical path reaching 97.86%. Therefore, FACT provides a promising approach for the reliability-aware circuit design.

View source

Similar papers

Conference Open access Sep 2026

XAI-VLSI: An Explainable Hybrid Graph Neural Network Framework for Intelligent Fault Prediction in Nanoscale Integrated Circuits

Evidence from experiments demonstrates that the HGNN outperforms traditional machine learning and deep-learning techniques, providing both high accuracy and interpretation, therefore making it an excellent candidate for the reliable, intelligent prediction of faults in VLSI.

Chavi Ralhan, Sachin Pal, J. Bajaj et al. · 0 citations
Open access Sep 2026

Quantifying the impact of feature-driven shortcuts in machine learning benchmarks for circuit performance prediction

This work provides a real-data-grounded account of how a formula-driven feature dependency can still function as a practical shortcut in feature-based ML benchmarking, and offers a replicable, statistical protocol with repeated splits, effect sizes, and confidence intervals, for auditing similar dependencies in other E...

A. Kashyap, Souhardya Ghosh, Sarmad Sultan et al. · 0 citations
Conference Open access 2026

From Logical Effort to Machine Learning: A Survey on Delay Modeling in Digital Circuits

It is found from the principle that the two modeling ideas are not in a replacement relationship but complement each other, and the traditional formula-driven method has high interpretability and is an effective method for precise simulation and design of core devices at the current stage.

Yi-Fan Liu · 0 citations
#machine learning Preprint Oct 2026

Exploring the Trade-Off Between Structured Pruning and Fault Tolerance in Deep Neural Networks for Space Applications

Deep Neural Networks (DNNs) inherently exhibit a degree of robustness to bit-level faults due to their distributed representation of information. As a model increases in width, this information becomes more dispersed, theoretically reducing the impact of any single bit fault. In this paper, we empirically investigate t...

Toon Vinck, N. Jonckers, J. De Roose et al. · 0 citations
#artificial intelligence Preprint Sep 2026

LevelSyn: Physical-Aware Logic Synthesis via Level-Asynchronous Graph Neural Networks

LevelSyn is a novel physical-aware logic synthesis framework that integrates hierarchical representation learning with a wirelength-driven optimization engine that significantly outperforms state-of-the-art methods on the EPFL benchmark suite.

Jing-Yi Zhou, Zheng-Yuan Shi, Zi-Yang Zheng et al. · 0 citations
Open access Sep 2026

Reliability-Oriented Multi-Class Fault-Injection Acceleration for Digital Integrated Circuits via Heterogeneous Spatio-Temporal Graph Learning

The pre-silicon reliability analysis of digital integrated circuits relies on fault-injection campaigns to characterize how single-event upsets propagate into distinct system-level outcomes. Exhaustive gate-level injection is expensive, whereas most learning-based accelerators collapse failure manifestations into a sin...

Jia-Qi Lu, Chang-Qin Xu, Hui-Xin Peng et al. · 0 citations

Related blog posts

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.